This contract concerns the full wet‑method demolition of existing structures at 1307 Willow Lane, Mobile, Alabama, including removal of debris, utility caps, erosion‑control measures, and site restoration. The City of Mobile’s Municipal Enforcement Department issued an RFQ (ME‑043‑26) with a sealed‑quote deadline of 11:00 a.m. on September 30 2026. The award was later posted to AA&A DEMOLITION. The scope mandates compliance with lead‑based paint and asbestos regulations, storm‑water management, and the provision of extensive close‑out documentation. Work must be completed within 30 calendar days of receiving a Notice to Proceed, with liquidated damages of $250 per day for delays beyond a 15‑day grace period.
• Wet‑method demolition of structures, footings, slabs, and associated debris.
• Mandatory utility disconnections, caps, and notification to the Municipal Enforcement Department.
• Comprehensive erosion‑control BMPs (temporary and permanent) and adherence to Clean Water Act and state sediment‑control rules.
• Required close‑out items: before/after photos, waste‑shipment records, newspaper notice, and lien‑release affidavits.
• Contractor must hold a valid City of Mobile business license, provide E‑Verify proof, and maintain appropriate insurance.