The contract is for the construction of the Shepherd Hills Water Booster Pump Station, which will provide additional water capacity to the North Rapid Water Pressure Zone. The project includes site grading, landscaping, utility connections, excavation, and construction of a new pump station building. The bid results show three bidders, with RCS Construction having the lowest base bid of $4,800,000.00. The project has an advertising authority of $4,000,000.00 and an engineer's estimate of $4,095,890.00.
• The project includes the construction of a new 3,500 gpm booster pump station.
• The pump station building will be 80' by 36' with a 14' side wall height.
• The project includes the installation of four horizontal split case pumps and one vertical multi-stage pump.
• The project also includes electrical work, including LED lighting, variable frequency drives, and a natural gas 250kw power generator.
• The bid results show three bidders, with RCS Construction having the lowest base bid.
• The project has an advertising authority of $4,000,000.00 and an engineer's estimate of $4,095,890.00.