This contract is for the purchase of two substation power transformers and placement on foundations at the Marion Road Substation in Rochester, MN. The work includes design, manufacture, testing, transportation, unloading, and setting of the transformers. The contract was awarded to Dakota Supply Group for $1,830,100.00, with a contingency of $128,107. The key aspects of this contract include the supply of outdoor power transformers, the installation and testing of the equipment, and the management of the project by the RPU Project Manager.
• The contract is for a specific project at the Marion Road Substation.
• The work includes design, manufacture, testing, and installation of the transformers.
• The contract was awarded to Dakota Supply Group.
• The contract amount is $1,830,100.00, with a contingency of $128,107.
• The RPU Project Manager will manage the project.