Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Pennsylvania
  4. ›Closed bids
  5. ›New Physics Building and Osmond Laboratory Renovations

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

New Physics Building and Osmond Laboratory Renovations

Won by ZGF Architects LLP$10MAwarded 11/15/2019Single Award
Contract source

Awarded vendors

  • ZGF Architects LLP

Description

The Pennsylvania State University selected ZGF Architects LLP to provide full architectural design services for a new 105,000‑gross‑square‑foot physics building and a 47,000‑gross‑square‑foot renovation of the east wing of Osmond Laboratory on the University Park campus. The project, funded through the university’s 2018‑2023 Five‑Year Capital Plan, has a total anticipated cost of $146 million and includes specialized vibration‑sensitive research labs, a 350‑seat lecture hall, demolition of an existing lecture‑hall wing, a subsurface storm‑water detention facility, and LEED‑certified sustainable design requirements. Procurement proceeded through a qualifications‑based process (LOI, long‑list, short‑list, interviews) culminating in the Board of Trustees’ selection on November 15 2019. The architect will work under a Construction‑Manager‑as‑Agent delivery method, coordinating with multiple prime contractors and a construction manager appointed by the state’s Department of General Services. • Scope: New freestanding physics building, renovation of Osmond Lab east wing, demolition, storm‑water facility, high‑bay lab, LEED‑level sustainable design. • Procurement: Open competitive qualification‑based selection; three firms shortlisted (HDR, Wilson HGA, ZGF) with final award to ZGF. • Funding & Delivery: $146 M total project cost; CM‑as‑Agent with multiple‑prime contracting; design services under PSU’s standard 1‑P agreement.

Attached files

Key dates

Bids closed
4/4/2024
Intent to award
11/15/2019
Awarded
11/15/2019
Starts
11/15/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310

Contract value

$10,000,000

The overall project budget is $146 million (including construction). Architectural design fees for a project of this size typically range from 5‑10 % of construction cost. Applying a midpoint of 7 % yields an estimated architect fee of roughly $7.8 million. Considering potential additional reimbursable expenses (travel, sub‑consultants, DBE participation), a reasonable ball‑park for the contract value is between $7 million and $10 million. This estimate assumes a standard fee structure for large academic research facilities and does not account for any undisclosed fixed‑price or incentive components.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.