Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›Bid Results: St. Vincent Greenway: Robert L Powell Place to St. Cha…

Awarded contract·Great Rivers Greenway·Missouri

Bid Results: St. Vincent Greenway: Robert L Powell Place to St. Charles Rock Road

$2MSingle Award
Contract source

Description

This entry documents a bid tabulation posted by Great Rivers Greenway for the St. Vincent Greenway project, covering the segment from Robert L. Powell Place to St. Charles Rock Road. The source material contains only a hyperlink reference to the results and explicitly states that no opening, award, or bid dates are provided. The PDF that presumably holds the detailed bid information is reported as corrupted and unreadable, leaving all substantive details—including the awarded vendor(s), contract value, scope of work, schedule, and contact information—unavailable. Consequently, the contract cannot be fully characterized beyond its location and the responsible agency. • Project: St. Vincent Greenway (Robert L. Powell Place → St. Charles Rock Road) • Procuring agency: Great Rivers Greenway (Missouri) • Data gaps: No vendor names, contract amount, dates, or scope details are available in the provided documents.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Civil Engineering
NAICS
237990

Contract value

$2,000,000

No explicit dollar amount is provided. A typical municipal greenway segment of this length (approximately 1‑2 miles) often ranges from $1 million to $3 million, depending on site conditions, design complexity, and amenities (e.g., paving, signage, drainage). Given the lack of detail, a conservative midpoint estimate of about $2 million is reasonable for budgeting and comparison purposes.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™