Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Closed bids
  5. ›Wastewater Treatment Optimization Study

Awarded contract·City of Sweet Home·Oregon

Wastewater Treatment Optimization Study

Won by Waterdude Solutions$150kSingle Award
Contract source

Awarded vendors

  • Waterdude Solutions

Description

The Wastewater Treatment Optimization Study contract was awarded to Waterdude Solutions by the City of Sweet Home. The contract is for a term-based duration of 8 months, starting on May 15, 2023, and ending on January 1, 2024. The scope of work includes a study to optimize the wastewater treatment process. Key points to consider are the contract's focus on professional services and its relatively short duration. • The contract is for a wastewater treatment optimization study. • The vendor is Waterdude Solutions. • The contract duration is 8 months. • The contract started on May 15, 2023, and ends on January 1, 2024. • The point of contact is Greg Springman, the Public Works Director.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
5/15/2023
Ends
12/31/2023
Duration
8 months

Last updated

Details

Award type
Single Award
Industry
Environmental Services
NAICS
541620
Solicitation №
2021-001

Contract value

$150,000

The contract value is not explicitly stated in the document. However, considering the contract is for a wastewater treatment optimization study with a duration of 8 months, the value could be estimated based on the average cost of similar studies. Assuming an average cost of $100,000 to $200,000 for such studies, a rough estimate for this contract could be around $150,000. This is a rough estimate and may not reflect the actual value of the contract. Factors that may influence the contract value include the complexity of the study, the expertise of the vendor, and the specific requirements of the City of Sweet Home.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Environmental Protection Agency·United States of America

Top match · 72%

R--Technical Support for Drinking Water Optimization Program

Closes 10/26/2026Opened 10/9/2026

City of Santa Barbara·California

71% match

Comprehensive Water and Wastewater Rate Studies

Closes 10/28/2026Opened 10/1/2026

City of Madison·Wisconsin

71% match

PFAS Testing of Wastewater and Biosolids Consultant

Closes 10/30/2026Opened 10/6/2026

City of Franklin·Tennessee

69% match

Wastewater Treatment Laboratory Services

Closes 10/29/2026Opened 10/8/2026

City of Franklin·Tennessee

69% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 10/29/2026Opened 10/8/2026

City of Franklin·Tennessee

69% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 10/29/2026Opened 10/8/2026

City of Salisbury·Maryland

69% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/18/2026

Maryland City of Salisbury·Maryland

69% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/19/2026

City of Bismarck·North Dakota

68% match

Wastewater Treatment Plant Polymer IFB

Closes 11/3/2026Opened 8/11/2026

City of Sioux City·Iowa

68% match

WASTEWATER TREATMENT PLANT FACILITY PLAN PHASE 1 IMPROVEMENTS PROJECT

Closes 10/29/2026Opened 10/14/2026

City of Richmond·Virginia

67% match

Wastewater Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

City of Elgin·Illinois

67% match

Professional Engineering Services

Closes 10/30/2026Opened 9/30/2026

New York City Department of Environmental Protection·New York

67% match

82627B0004-BEDC OB-144A: Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF)

Closes 11/18/2026Opened 10/7/2026

City of Santa Monica·California

67% match

Laboratory Analysis for Water, Wastewater, and Stormwater

Closes 10/21/2026Opened 9/24/2026

Department of Environmental Quality·Virginia

67% match

Commonwealth Wastewater Infrastructure Needs Assessment (CWNA) and Clean Watersheds Needs Survey (CWNS) Data Collection, Analysis and Reporting Services

Closes 10/19/2026Opened 9/10/2026

City of Melbourne·Florida

67% match

Water and Sludge Analysis Services

Closes 11/3/2026Opened 10/2/2026

Rancho Murieta CSD·California

67% match

RFP for Wastewater Treatment Plant Filter Bed Rehabilitation

Closes 10/22/2026Opened 9/15/2026

Maryland City of Baltimore·Maryland

66% match

PROJECT NO. 1407 WASTEWATER COLLECTION SYSTEM PROGRAM MANAGEMENT

Closes 11/19/2026Opened 9/18/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

66% match

Wastewater Treatment Plant Upgrades – Albert C. Wagner Correctional Facility

Closes 10/22/2026Opened 9/3/2026

Missouri Department of Corrections·Missouri

66% match

Wastewater Treatment Services Management

Closes 10/30/2026Opened 10/5/2026

Massachusetts Department of Correction·Massachusetts

66% match

19-DOC-9006-Wastewater Chemicals and Supplies

Closes 12/1/2028Opened 6/18/2025

Florida Department of Corrections (FDC)·Florida

66% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

City of Oshkosh·Wisconsin

66% match

2027 WATER CHEMCIALS - WATER FILTRATION AND WASTEWATER TREATMENT PLANT

Closes 10/28/2026Opened 10/8/2026

Town of Waterville, Washington·Washington

66% match

Wastewater Treatment Plant - Habitat Mitigation

Closes 10/28/2026Opened 10/10/2026