The contract is for the restoration of the Rice Creek Compost Site. The work includes removing and replacing unsuitable soils with specified growing media and restoring the site with native seed. The contract was awarded to six vendors: Sunram Construction, Urban Companies, Dunaway, New Look, Fehn, and MNL. The bid tabulation shows the prices for each vendor, with Sunram Construction being the lowest at $204,777.00.
• The contract is for a compost site restoration project
• The work includes soil removal and replacement, and site restoration with native seed
• Six vendors were awarded the contract
• The lowest bid was $204,777.00 by Sunram Construction