Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Closed bids
  5. ›Snohomish River Trail, Design Services

Awarded contract·Snohomish County·Washington

Snohomish River Trail, Design Services

Won by Toole Design Group$250kAwarded 4/10/2024Single Award
Contract source

Awarded vendors

  • Toole Design Group

Description

This contract is a Request for Quotation (RFQ) for professional design services related to the Snohomish River Trail, a multimodal trail project in Snohomish County, Washington. The county issued the RFQ on August 1 2023, received proposals by August 29 2023, and awarded the contract to Toole Design Group on April 10 2024. The award is a lump‑sum, firm‑fixed‑price agreement for the complete design scope, which likely includes preliminary engineering, detailed design drawings, environmental compliance, and coordination with stakeholders. No contract dollar amount, term, or renewal provisions are disclosed in the public record. • Scope: Full design services for the Snohomish River Trail (e.g., alignment, grading, structures, utilities, and permitting). • Procurement: Full and open competition RFQ with a single award to Toole Design Group. • Award Type: Lump‑sum (firm‑fixed‑price) award; contract value not publicly disclosed.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
8/29/2023
Intent to award
4/10/2024
Awarded
4/10/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQ-23-003TB

Contract value

$250,000

The public documents do not disclose a contract amount. However, design services for a county‑level trail project typically range from $150,000 to $400,000 depending on length, environmental constraints, and level of detail required. Given that the project is a significant river trail and that the award was made to a professional design firm, a reasonable midpoint estimate would be roughly $250,000. This estimate assumes a moderate scope (pre‑design, schematic design, and 30‑day construction‑phase design) and standard hourly rates for engineering staff.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Cobb County Department of Transportation·Georgia

Top match · 71%

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Haines City·Florida

71% match

Boomerang Park Nature Trail Project - Design Services

Closes 11/10/2026Opened 10/9/2026

City of Green Cove Springs·Florida

70% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Georgia Cobb County Department of Transportation·Georgia

70% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Smithville·Missouri

68% match

RFP 26-15 Riverwalk Trail - Smithville, MO

Closes 10/27/2026Opened 9/28/2026

Laramie Rivers Conservation District·Wyoming

67% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Massachusetts Town of Lynnfield·Massachusetts

67% match

Willis Wood Trail Development

Closes 10/15/2026Opened 10/1/2026

Columbus Consolidated Government·Georgia

67% match

Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

Missouri Department of Transportation·Missouri

66% match

TAP-3302(449), KC District, City of Smithville, construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

City of Panama City·Florida

66% match

Professional Services for Panama City for Frankford Avenue Trail

Closes 10/21/2026Opened 9/17/2026

City of Portsmouth·New Hampshire

66% match

Portsmouth Seacoast Greenway Trailheads Design and Engineering

Closes 10/19/2026Opened 8/24/2026

Virginia Department of Transportation·Virginia

66% match

B05_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

Columbus Consolidated Government·Georgia

66% match

Dragonfly Trail - River Road Segment (S.R. 219)

Closes 10/21/2026Opened 8/18/2026

City of Atlanta·Georgia

66% match

QBS/DOT/2620-1270098 PATH Lakewood Trail

Closes 10/30/2026Opened 10/12/2026

Missouri Department of Transportation·Missouri

66% match

TAP-3302(450) KC District, City of Smithville. construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

City of Keene·New Hampshire

66% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Virginia Department of Transportation·Virginia

66% match

B02_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

Georgia Columbus Consolidated Government·Georgia

65% match

RFB No. 27-0006 Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

U.S. Department Of Transportation·Washington

65% match

OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

Closes 10/21/2026Opened 7/15/2026

City of Green Bay·Wisconsin

65% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Phoenix·Arizona

65% match

Cartographic Services

Closes 10/23/2026Opened 9/23/2026

City of Dubuque·Iowa

65% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

City of Green Bay·Wisconsin

65% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Trout Unlimited·Wyoming

65% match

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026Opened 10/9/2026

North Carolina City of Raleigh·North Carolina

65% match

Re-advertisement Design Build Services Forest Ridge Park Mountain Bike Trail

Closes 10/15/2026Opened 9/24/2026