Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Pennsylvania
  4. ›Closed bids
  5. ›Student Union Building Renovation and Addition - Penn State New Ken…

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

Student Union Building Renovation and Addition - Penn State New Kensington

Won by DIGSAU$1MAwarded 2/7/2022Single Award
Contract source

Awarded vendors

  • DIGSAU

Description

This contract awards Penn State’s New Kensington Student Union renovation and addition design services to DIGSAU. The project expands the existing 16,000 SF student union with a new 14,390 SF addition (reduced to ~10,000 SF to meet a $10 M budget) and upgrades building systems, accessibility, and interior programming—including a student success center, health‑and‑wellness facilities, and a modern “Campus Living Room.” The design‑build team will deliver program validation, multiple conceptual options, schematic design, design development, and construction‑document packages while collaborating with a later‑selected construction manager at risk. The total construction cost is budgeted at $8.9 M, with design fees likely representing roughly 10 % of that amount. Key milestones include LOI (Nov 5 2021), RFP (Dec 6 2021), short‑list interview (Feb 7 2022), construction start (Jan 2023), and anticipated occupancy (mid‑2024). The university emphasizes high‑performance sustainability standards (ASHRAE 90.1/189.1) and encourages DBE participation. • Scope: full‑building architectural and engineering design for renovation + new addition. • Budget: $8.9 M construction; design‑service fee estimated near $1 M. • Schedule: award Feb 2022 → design phases 2022 → construction 2023‑2024. • Requirements: three concept options, compliance with PSU high‑performance standards, DBE inclusion, and collaboration with a construction‑manager‑at‑risk.

Attached files

Key dates

Bids closed
1/5/2022
Intent to award
2/7/2022
Awarded
2/7/2022
Starts
2/7/2022

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310
Solicitation №
Penn State Project No. 00‑06841.00 (New Kensington Student Union 1‑S)

Contract value

$1,000,000

The documents state the total construction budget is $8.9 million. Architectural and engineering design services for a project of this size typically range from 8 % to 12 % of construction cost. Using a midpoint of 10 % yields an estimated design‑service fee of about $890,000. Considering the need for multiple concept options, coordination with a construction manager, and high‑performance sustainability compliance, the award fee is likely rounded up to roughly $1 million. Therefore, the contract’s estimated value is approximately one‑million dollars.