The Wood Street Improvements project is a comprehensive civil‑construction effort in Wrangell, Alaska, encompassing roadway resurfacing, sidewalk and curb installation, storm‑drain and sanitary sewer upgrades, water‑main replacement, fish‑stream culvert realignment, and extensive underground electrical utilities. The work is structured as a unit‑price contract with an engineer’s cost estimate of $700‑$1.1 million and a stipulated substantial completion date of 15 September 2016, with liquidated damages of $1,500 per day for late finish. Key points include:
• Bid submission deadline 2 pm April 28 2016, with a pre‑bid conference on April 20 2016.
• Two alternates (Paving Alternate A – concrete vs. asphalt; Additive Alternate B – additional utilities) must be priced.
• Contract requires 5 % bid security, 100 % performance and payment bonds, and compliance with Alaska prevailing‑wage and certified‑payroll requirements.