This rebid solicitation covers the renovation of the Greenway Terrace Playground in Waukesha, Wisconsin. The primary scope is the installation of a high‑impact resilient surfacing (colored granule) over 4,700 sf, complemented by mandatory site‑work items such as inlet protection, sidewalk removal, aggregate base course, grading, a new 4‑inch concrete sidewalk, and topsoil/sod installation. The base‑bid total is $192,269, while the alternate‑bid total (lower‑cost option for mandatory items) is $193,620. Bids were received on June 26, 2026 at 11:00 AM CDT. Perfect Turf Distributing LLC is the listed primary contractor. No award, start, or completion dates are provided.
• Primary work: single‑pour resilient playground surface (≈ $113 k).
• Mandatory supplemental work: inlet protection, demolition, base aggregate, grading, new concrete sidewalk, and landscaping (≈ $80 k).
• Total contract ceiling: roughly $193 k, indicating a mid‑size municipal construction project.