The State of Michigan is soliciting quotations for the design, construction, and installation of underground mechanical utilities for the Woodland Correctional Facility located at Whitmore Lake in Livingston County. The scope includes water‑main, sanitary‑sewer, storm‑drain, electrical and communication conduit installation, hydro‑excavation of existing utility crossings, de‑watering, soil‑erosion control, and preparation of phasing and construction plans that accommodate ongoing prison operations. Contractors must provide field verification of existing utilities, coordinate with the Department of Corrections, and ensure all work meets state‑specified standards for safety, back‑filling, and site restoration.
• Design and construction of site‑mechanical underground utilities (water, sewer, storm, electrical, communications).
• Hydro‑excavation and utility crossing verification (including potential unknown high‑voltage or fiber lines).
• Dewatering and erosion‑control measures; contractor‑provided dewatering not separately compensated.
• Phasing plan required to maintain prison movement and operations during construction.
• Required submission of detailed drawings, specifications, and cost breakdowns per the bid documents.
• Project located in Whitmore Lake, Livingston County, MI; multiple milestone dates listed (e.g., review 08‑15‑2024, 12‑05‑2024; final bid documents due 10‑09‑2026).