Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Closed bids
  5. ›River Street Re-Alignment Project

City of Davenport·Iowa

River Street Re-Alignment Project

Closes 8/10/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Davenport is seeking bids from qualified contractors for the River Street Re-Alignment Project. The project involves the construction of new roadway, reconstruction of existing roadway, ADA sidewalk and ramps, integrated curb installation and replacement, and other improvements. The project is expected to start on September 1, 2026, and be completed by October 30, 2026. The contractor will be responsible for providing all labor, materials, and equipment necessary for the project. • The project includes the furnishing of all labor, materials, and equipment necessary for the construction of new roadway and reconstruction of existing roadway. • The project includes ADA sidewalk and ramps, integrated curb installation and replacement. • The contractor shall be responsible for resetting all existing utility surface features to finish grade. • The contractor shall be responsible for replacement of driveway approach aprons, topsoil, sodding, and erosion control. • The contractor shall provide a seventy-two (72) hour notice to the Engineer prior to the removal of any street name signs or traffic control signs that will conflict with construction operations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kari Thoren(Purchasing Division)

[email protected]

(563) 888-2267

Key dates

Opened
7/21/2026
Questions due
7/30/2026
Closes
8/10/2026
Duration
59 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
27-9

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated in the document, but based on the scope of work, which includes construction of new roadway, reconstruction of existing roadway, and other improvements, it can be estimated to be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the project will require significant labor, materials, and equipment, and will involve multiple stages of construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Newberg·Oregon

Top match · 76%

River Street Rebuild 2027

Closes 11/9/2026Opened 10/12/2026

Moore & Bruggink, Inc·Michigan

69% match

East River Street Improvements – Spring Lake

Closes 10/28/2026Opened 9/30/2026

Catawba Regional Council of Governments·South Carolina

67% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Williamsburg·Virginia

67% match

IFB 08 4101 27 FY27 Citywide Street Resurfacing

Closes 10/27/2026Opened 10/5/2026

City of Riverside, MO·Missouri

67% match

Riverway Boulevard Improvements - Riverside, MO

Closes 10/15/2026Opened 9/9/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

County of Ocean·New Jersey

66% match

Reconstruction of Cross Street, County Route 626 from Prospect Street to Augusta Boulevard – Phase 2, Township of Lakewood

Closes 10/20/2026Opened 9/30/2026

City of Hampton·Virginia

66% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

NYS Niagara Falls, City of·New York

66% match

2026 -2 Road Resurfacing Project (various locations)

Closes 10/20/2026Opened 10/1/2026

City of Broken Arrow·Oklahoma

66% match

Oak Creek South Concrete Street Rehabilitation

Closes 10/27/2026Opened 9/29/2026

City of Indianapolis·Indiana

66% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Montpelier·Vermont

66% match

River's Edge Action Plan (REAP)

Closes 10/30/2026Opened 9/29/2026

Clermont County Engineer's Office & Transportation Improvement District·Ohio

66% match

Old SR 74/Elmont Drive Turn Lane, Drainage, and Road Widening Project (PID 90930)

Closes 10/15/2026Opened 9/24/2026

City of Fremont·Ohio

65% match

Tiffin Street Bridge Replacement Project

Rolling / TBD closeOpened 9/29/2026

Johnson County·Kansas

65% match

81st Street and Nieman Road Stream Crossing Repairs – Contract No. SMTC-C046

Closes 10/30/2026Opened 9/29/2026

City of San Antonio·Texas

65% match

23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 10/30/2026Opened 9/30/2026

City of Hastings·Nebraska

65% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Cedar Rapids·Iowa

65% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

65% match

STSRR PROJECT 21-7 STREETS IN TARA,OXFORD,SHERWOOD FOREST, DARRYL,BARD

Closes 11/3/2026Opened 10/6/2026

Pulaski County Comptroller’s Office·Arkansas

65% match

RIVER PORT ROAD PHASE II

Rolling / TBD closeOpened 8/23/2026

Little Rock Port Authority·Arkansas

65% match

PORT OF LITTLE ROCK BANK REPAIRS - REBID

Closes 10/21/2026Opened 9/20/2026