Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Z--BRCA 310427 Southbound Shuttle Stop

U.S. Department Of The Interior·Utah

Z--BRCA 310427 Southbound Shuttle Stop

Closes 11/3/2026$800k – $2.5MRequest for Proposal
Get bids like this by emailBid source

Description

The National Park Service is seeking a small‑business contractor to design and construct a new southbound shuttle‑bus stop, associated curb, sidewalk, retaining wall, signage, and pedestrian crosswalk at Bryce Canyon National Park. The work includes site preparation, utility relocation, new storm‑drain culverts, asphalt and concrete paving, ADA‑compliant ramp, shelter, and full traffic‑control planning while protecting sensitive wildlife habitat. The contract is a firm‑fixed‑price, lump‑sum award with a performance period of approximately five months. • Construct shuttle‑lane, curb, retaining wall, ADA‑ramp, shelter, and pedestrian crossing at the visitor‑center intersection. • Perform demolition, utility relocation, new storm‑drain culverts, asphalt & concrete paving, striping, and MUTCD‑compliant signage. • Provide traffic‑control, erosion‑control, and wildlife‑protection plans; comply with Buy‑American, minimum‑wage, and DEI requirements. • Small‑business set‑aside; award will be negotiated after evaluation of technical and price factors.

Attached files

Contact

Zaira Lupidi(Contracting Officer)

[email protected]

(000) 000-0000

Key dates

Opened
10/16/2026
Questions due
10/5/2026
Closes
11/3/2026
Duration
150 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
140P2026R0065

Budget estimate

$800,000 – $2,500,000

The scope involves a complete shuttle‑stop installation with roadwork, concrete, utilities, signage, and extensive environmental controls. Similar NPS shuttle‑stop projects in comparable parks have ranged from $1 M to $2.5 M depending on site conditions, material costs, and labor rates (including prevailing‑wage requirements). Assuming a mid‑range unit cost of $1,200–$2,000 per square foot of paved area plus $500 K–$800 K for structural and utility work, the total contract value is likely between $800 K and $2.5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Colorado

Top match · 96%

BRCA 310427 Southbound Shuttle Stop

Closes 10/19/2026Opened 4/20/2026

U.S. Department Of The Interior·Utah

83% match

DINO REPLACE SWING ARM GATES

Closes 10/30/2026Opened 9/23/2026

U.S. Department Of The Interior·South Dakota

83% match

Y--Construct North Unit Visitor Center at BADL

Closes 10/29/2026Opened 10/7/2026

U.S. Department Of The Interior·Wyoming

83% match

Z--YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 10/7/2026

U.S. Department Of The Interior·Colorado

81% match

YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 4/24/2026

U.S. Department Of The Interior·Colorado

81% match

GRTE 237343 - Rehab 4 Lazy F Ranch

Closes 11/13/2026Opened 7/15/2026

U.S. Department Of The Interior·Colorado

80% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 6/26/2025

U.S. Department Of The Interior·Colorado

80% match

Z--GOGA 336173 - Repair Conzelman Road

Closes 10/29/2026Opened 8/31/2026

U.S. Department Of The Interior·Arizona

80% match

Grand Canyon National Park, AZ: Follow-On Potable

Closes 10/23/2026Opened 10/15/2026

U.S. Department Of The Interior·Colorado

80% match

Y--GLCA 318882 Bullfrog

Closes 10/30/2026Opened 11/18/2025

U.S. Department Of The Interior·Wyoming

80% match

Y--GRTE 237343 - Rehab 4 Lazy F Ranch

Closes 11/20/2026Opened 10/5/2026

U.S. Department Of The Interior·California

79% match

J--LAKE25-101-CC LIFT STATION PUMP REPAIR

Closes 6/6/2029Opened 6/3/2025

U.S. Department Of The Interior·California

79% match

Z--GOGA 336173 - Repair Conzelman Road

Closes 10/29/2026Opened 10/7/2026

Ben Franklin Transit·Washington

79% match

Bus Stop Concrete Pad and Amenity Installations

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Defense·Missouri

79% match

Harry S. Truman Mass Solicitation - Park Attendant Services

Closes 10/19/2026Opened 10/1/2026

U.S. Department Of The Interior·Montana

79% match

R--Staffing for Visitor Transportation Services for Glacier National Park

Closes 10/21/2026Opened 10/7/2026

Town of Westwood·Massachusetts

79% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of San Diego·California

79% match

Robb Field Gateway Path

Closes 10/29/2026Opened 9/28/2026

City of Pontiac MI·Michigan

78% match

Community Park Restroom Construction

Closes 10/30/2026Opened 9/11/2026

Nevada Government·Nevada

78% match

BUS STOP CIVIL IMPROVEMENTS EXHIBITS

Closes 10/22/2026Opened 9/17/2026

Douglas County·Nebraska

78% match

Levi Carter Park Parking Lot Renovation

Closes 10/21/2026Opened 10/7/2026

U.S. Department Of The Interior·Arizona

78% match

Y--GRCA 257282 - Replace Wastewater Plant at South Ri

Closes 11/18/2026Opened 10/16/2026

Douglas County·Nebraska

78% match

Levi Carter Park Parking Lot Renovation

Closes 10/21/2026Opened 10/7/2026

City of Reno·Nevada

78% match

Landscape Right of Way Maintenance

Closes 10/29/2026Opened 10/7/2026

U.S. Department Of Transportation·Washington

78% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 9/23/2026