The Western Virginia Water Authority seeks a turnkey contractor to design, fabricate, install, program, and commission a new control system for Blower #8 at the Roanoke Regional Water Pollution Control Plant. The work includes on‑site hardware review, engineering design, PLC/HMI programming, panel fabrication, field instrumentation, electrical wiring, network integration, start‑up, testing, training, and delivery of full documentation with a minimum one‑year warranty.
• Full control‑system engineering (schematics, panel layout, Bill of Materials) and custom PLC/HMI software.
• Supply and install a Schneider M340 PLC, Weintek HMI, network switch, backup power, and a suite of specified field instruments (pressure, temperature, vibration, solenoid valves, etc.).
• Provide electrical contracting, Ethernet routing, startup, commissioning, operator training, and comprehensive O&M manuals.
• Mandatory on‑site visit on August 24 2026; proposals due electronically by September 15 2026.
• Evaluation based on qualifications (30 pts), technical approach (20 pts), resources & schedule (20 pts), commitment (15 pts), and cost (15 pts).