The City of West Des Moines is seeking a qualified Construction ManagerâatâRisk (CMaR) to provide preâconstruction and construction management services for the demolition, site work, and construction of a new 16,600 sf Fire & EMS Station 21 (plus a 2,250 sf mezzanine). The CMaR will develop a Guaranteed Maximum Price (GMP), coordinate designâbuild activities, manage subcontractor bids, and oversee construction through commissioning, with an anticipated construction period from June 2027 to October 2028 and a total project budget of approximately $12.7 million.
⢠Scope includes demolition of existing station (excluding telecom tower & generator), site grading, utilities, pavement, landscaping, and construction of a concreteâmasonry main building with steelâframed roof.
⢠Required services: preâconstruction constructability reviews, cost estimating, value engineering, bid package development, GMP negotiation, constructionâphase scheduling, safety program, quality control, and warrantyâperiod oversight.
⢠Minimum qualifications: 80 point scoring threshold, demonstrated experience on similar publicâsafety facilities, solid safety record, ability to obtain required insurance and bonds, and submission of nonâcollusion affidavit.
⢠Key dates: Preâbid conference 9/14/2026 (nonâmandatory), questions due 9/18/2026, SOQ deadline 9/30/2026, RFP issuance 10/13/2026, proposal deadline 10/21/2026, contract award 11/16/2026.
⢠Deliverables: Detailed cost estimates at design milestones, GMP agreement, construction schedule, and final closeâout documentation.
⢠Evaluation based on relevant project experience, past performance, safety record, proposed personnel, and methodology.