Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›Fernwood Terrace Water Main Relocation

Public Water Supply District No. 2 of St. Charles County·Missouri

Fernwood Terrace Water Main Relocation

Closes 6/30/2026$30k – $60kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This project involves the relocation of an existing water main on Fernwood Terrace. The scope includes installing approximately 79 linear feet of 6‑inch restrained ductile‑iron pipe, along with necessary tapping sleeves and fittings. Bids must be sealed and submitted by the deadline, with a pre‑bid meeting held beforehand. The owner will award the contract to the lowest responsive and responsible bidder, and all bidders must provide a 5 % bid security and comply with prevailing wage and OSHA safety requirements. • Install ~79 LF of 6″ ductile‑iron water pipe on Fernwood Terrace. • Provide tapping sleeves, fittings, and related accessories. • Submit sealed bids by June 30 2026, after attending the optional pre‑bid meeting on June 9 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Richard McGhay

[email protected]

(314) 354-7364

Key dates

Opened
6/9/2026
Pre-bid meeting
6/9/2026
Closes
6/30/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
26-061

Budget estimate

$30,000 – $60,000

Based on typical costs for ductile‑iron pipe installation (~$150‑$250 per linear foot) plus fittings, labor, mobilization, and required safety/compliance measures, the total contract value is estimated between $30,000 and $60,000. The lower end assumes minimal labor and material costs; the higher end accounts for more extensive fittings, higher labor rates, and contingency allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Hastings Utilities·Nebraska

Top match · 73%

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Dunedin·Florida

71% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

Hastings Utilities·Nebraska

68% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Town of Eatonville·Florida

68% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

St. Lucie County - Purchasing Department·Florida

67% match

Avenue M New Entrance Road & Stormwater Pipeline Relocation at Harbour Pointe

Closes 11/4/2026Opened 10/4/2026

Harris County·Georgia

67% match

US Hwy 27 Water Main Relocation

Closes 1/18/2027Opened 12/9/2022

City of Edgewater, FL·Florida

67% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Massachusetts Town of Abington·Massachusetts

66% match

Abington Central Street Water Main Improvements

Closes 10/28/2026Opened 10/7/2026

Edgefield County Water and Sewer Authority·South Carolina

66% match

EAST WISE STREET WATER MAIN REPLACEMENT

Closes 10/27/2026Opened 9/22/2026

Village of Wellington·Florida

66% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 10/29/2026Opened 9/29/2026

City of Charlotte·North Carolina

66% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Oregon City of Beaverton·Oregon

65% match

ITB 27-009 Erickson Ave Waterline Replacement (2nd St to 5th St)

Closes 10/21/2026Opened 9/30/2026

Mississippi

65% match

Highway 11 Water Main Relocation

Closes 10/20/2026Opened 10/1/2026

City of DeLand·Florida

65% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of DeLand·Florida

65% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026

Oregon Medford Irrigation District·Oregon

65% match

RFP_MID_ODOT_Uility_Relocation

Closes 11/9/2026Opened 10/9/2026

City of Beaverton·Oregon

65% match

Erickson Ave Waterline Replacement (2nd St to 5th St)

Closes 10/21/2026Opened 9/30/2026

City of Branson·Missouri

65% match

RFB 2886-22 Neighborhood Water System Improvements – Lakeview Estates

Closes 10/30/2026Opened 10/2/2026

City of South San Francisco·California

65% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/5/2026Opened 10/1/2026

City of Folly Beach·South Carolina

64% match

Folly Beach Redundant Water Main - Prime Contractor Prequalification

Closes 10/14/2026Opened 9/9/2026

City of Hastings Public Works / Utilities·Nebraska

64% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

Miami-Dade Water and Sewer Department·Florida

64% match

Furnish and Install 8-inch PVC C900 Force Main and 8-inch PVC C900 Water Main along SW 152nd St

Closes 10/26/2026Opened 9/15/2026

Nevada Government·Nevada

64% match

6th Street Water Main Abandonment

Closes 10/27/2026Opened 10/6/2026

Northern Kentucky Water District·Kentucky

64% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026