The Department of the Navy is seeking commercial vendors to design, fabricate, transport, construct, and commission modular barracks at Marine Corps Base Camp Pendleton, California, using advanced manufacturing and Industrialized Construction (IC) methods under an Other Transaction Authority (OTA). The effort covers approximately 656,000 sq ft across ten buildings (four BEQs in Area 24, three BEQs in Area 13, and three BEQs in Area 41), totaling roughly 800 occupants per building set, with demolition of existing structures and replacement with energy‑efficient, resilient modular units. Vendors must submit a ten‑page white paper by 1 Oct 2026, demonstrating:
• At least three IC projects ≥ $50 M each within the past ten years (aggregate ≥ $150 M).
• Ability to reduce design/build cost by ≥ 20 % and schedule by ≥ 30 % versus traditional construction.
• Capability to manage large‑scale IC delivery in the Southwestern U.S., including bonding and quality‑control responsibilities.
The selection process includes a Phase 1 AOI white‑paper review, short‑listing, then a Phase 2 Request for Project Proposal (RPP) with full technical, cost, and schedule proposals, followed by negotiations and potential award of a follow‑on production OTA.
• Location: MCB Camp Pendleton, CA (Southwest U.S.)
• Scope: Design, manufacture, logistics, construction, and commissioning of 10 modular barracks (≈ 656 k sf).
• Delivery expectations: 9‑12 month design/approval window; overall project timeline not specified but modular approach aims for accelerated delivery.
• Required experience: Minimum three large‑scale IC projects (≥ $50 M each) in past decade.
• Evaluation criteria: Relevant experience, technical approach, vendor capability.
• Submission: White paper ≤ 10 pages, due 01 Oct 2026, 1400 EST.
• Potential for follow‑on OTA contracts beyond the initial award.