This solicitation calls for the design, demolition, construction, and commissioning of a new multi‑story chilled‑water plant at the West Haven VA Medical Center, together with extensive site‑utility upgrades, fuel‑oil tank farm replacement, redundant campus electrical feed, and associated civil, mechanical, electrical, and structural work. The project must be performed on an active medical campus with strict coordination to minimize disruption to patient care, comply with VA security and LEED Silver standards, and adhere to extensive BIM, safety, and environmental requirements.
• Replace existing chilled‑water plant (building 16a) and build a new plant with chillers, cooling towers, pumps, and related MEP equipment.
• Install a new fuel‑oil tank farm, demolish existing plant, and provide redundant electrical duct‑bank and campus‑wide utility back‑feeds.
• Perform asbestos removal, rock excavation, and installation of new domestic‑water, fire‑protection, steam, and chilled‑water distribution loops.
• Deliver full BIM/CIM models, testing & commissioning, O&M manuals, and warranty support while meeting LEED Silver and VA security criteria.