The USDA Forest Service is seeking a qualified contractor to inspect, clean, rehabilitate, and replace the sub‑mersible pump and associated components of the Lava Lands Visitor Center potable‑water well in Deschutes National Forest, Oregon. Work includes a down‑hole video survey, sediment removal, pump installation (20 HP), optional drop‑pipe repair, and optional well clean‑out using a bailer. All activities must comply with Oregon Health Authority regulations and be performed by a licensed water‑supply well constructor. The contract is a total small‑business set‑aside with a period of performance from 1 Oct 2026 to 15 Nov 2026.
• Location: Lava Lands Visitor Center, 58201 US‑97, Bend, OR 97707
• Scope: video well survey, pump removal, system flushing, pump replacement, optional drop‑pipe repair (≈40 LF) and optional well clean‑out (≤10 ft sediment)
• Requirements: licensed well constructor, SAM registration, 100 % payment bond (>$35 k), insurance (general liability $500 k, workers’ comp, auto liability)
• Deliverables: video logs, 1‑page rehabilitation report, as‑built documentation, water‑quality testing results
• Schedule: start 1 Oct 2026, complete by 15 Nov 2026; work limited to weekdays, 7 am‑5:30 pm.