Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Delaware guideDelaware Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Delaware
  4. ›Closed bids
  5. ›REPLACEMENT OF BR 3-164 ON SR36 CEDAR BEACH ROAD

Delaware undefined DOT·Delaware

REPLACEMENT OF BR 3-164 ON SR36 CEDAR BEACH ROAD

Closes 5/20/2025$10M – $20MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Delaware Department of Transportation is seeking bids for the replacement of Bridge 3-164 on SR36 Cedar Beach Road. The project involves replacing the existing movable swing span bridge with a single leaf bascule span bridge, as well as replacing the approach spans, roadway approaches, and the operator's house. The project requires the contractor to provide all labor and materials for the replacement of the bridge and its components. The contractor must also ensure that the bridge is constructed in accordance with the plans, specifications, and requirements outlined in the bid proposal. Some key aspects of the project include: • Replacement of the existing bridge with a new single leaf bascule span bridge • Replacement of the approach spans, roadway approaches, and the operator's house • Provision of all labor and materials for the replacement of the bridge and its components • Construction of the bridge in accordance with the plans, specifications, and requirements outlined in the bid proposal • Compliance with environmental regulations and permits • Coordination with DelDOT and other stakeholders to ensure a successful project The project has a completion time of 417 calendar days and a Disadvantaged Business Enterprise (DBE) goal of 6%. The contractor must also comply with the Delaware Contractor Registration Act and implement a Mandatory Drug Testing Program.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(302) 760-2031

Key dates

Opened
3/21/2025
Pre-bid meeting
4/7/2025Mandatory
Closes
5/20/2025
Duration
417 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
T202007301

Budget estimate

$10,000,000 – $20,000,000

Based on the project description and the quantities listed in the bid proposal, the estimated budget for this project could be in the range of $10 million to $20 million. This estimate takes into account the costs of materials, labor, and equipment required for the replacement of the bridge and its components. However, the actual budget may vary depending on the bids received and the final contract award. Factors that may influence the budget include the complexity of the project, the experience and qualifications of the contractor, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Panama City Beach·Florida

Top match · 64%

CRA Front Beach Road Segment 4.1 Design-Build

Closes 10/22/2026Opened 7/28/2026

City of Lake Charles·Louisiana

62% match

Shell Beach Drive Bridge over Pithon Coulee Repair – CP3445

Closes 10/20/2026Opened 9/24/2026

City of Long Beach·California

61% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

City of Norfolk·Virginia

61% match

Virginia Beach Blvd Over NS RR Bridge Rehabilitation

Closes 11/16/2026Opened 10/2/2026

City of Santa Barbara·California

61% match

San Roque Water Main Replacement Project

Closes 10/13/2026Opened 9/4/2026

City of Charlotte·North Carolina

61% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Montrose County·Colorado

61% match

2026 B-117 Spring Creek Road Bridge Replacement

Closes 10/22/2026Opened 9/30/2026

California Department of Parks and Recreation·California

61% match

C26863020 MORRO STRAND STATE BEACH - Campground Entrance Road Repairs

Closes 10/23/2026Opened 9/15/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

61% match

Spring Gut Road Bridge Replacement

Closes 10/14/2026Opened 8/24/2026

City of Huntington Beach·California

61% match

CC 1698 - Well 4 Facilities Upgrades

Closes 10/29/2026Opened 10/7/2026

Georgia Savannah Airport Commission·Georgia

61% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

NYS Madison County·New York

60% match

RFB 2026-29 PIN 754.86 – Replacement of Lebanon Road (CR 62) Bridge over Stone Mill Brook

Closes 10/15/2026Opened 9/17/2026

City of Folly Beach·South Carolina

60% match

RFP 06-26: S-52 (East Ashley Avenue) & S-247 (2nd Street East) RRFB Installation

Closes 10/28/2026Opened 9/16/2026

California Department of Forestry and Fire Protection·California

60% match

CONTRACT 3CA08001 - Flooring Replacement services **SB BIDDERS ONLY**

Closes 11/3/2026Opened 10/7/2026

City of Laguna Beach·California

60% match

Coast Highway Median Landscape Upgrades (C2606)

Closes 10/21/2026Opened 9/25/2026

Massachusetts Department of Transportation·Massachusetts

60% match

608020 BOURNE Bridge Replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal,

Closes 5/27/2027Opened 3/23/2026

City of Rancho Cordova·California

60% match

Bridge Preventative Maintenance Repair At Horn Road

Closes 11/2/2026Opened 10/8/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Santa Barbara·California

60% match

Transmission Main Renewal Phase 2

Closes 10/16/2026Opened 9/10/2026

City of Cedar Rapids·Iowa

59% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

The Village of Royal Palm Beach·Florida

59% match

104 Hemingway Ct Curb Replacement

Closes 10/23/2026Opened 10/9/2026

New York City Department of Environmental Protection·New York

59% match

82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF

Closes 11/18/2026Opened 10/7/2026

City of Virginia Beach·Virginia

59% match

Service Arena - 242 S Harton Circle Pump Station Force Main Replacement

Closes 10/22/2026Opened 9/10/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

59% match

Structure Replacements – Bridge No. 09‑0071 and 09‑0070 – Merrill Road, Clearfield County, Pennsylvania

Closes 10/15/2026Opened 9/16/2026

U.S. Department Of Veterans Affairs·New York

59% match

Brooklyn Upgrade Life Safety/Critical Branch Electrical Construction - 630A4-16-430

Closes 10/30/2026Opened 9/30/2026