The City of Sacramento is seeking a qualified contractor to demolish the existing single‑stall restroom at Earl Warren Park and install a new prefabricated, ADA‑compliant restroom building, including associated site grading, concrete work, utility reconnections, and landscape restoration. The scope covers temporary fencing, demolition, grading, new concrete flatwork, utility tie‑ins (water, sewer, electrical), provision of a portable restroom during construction, irrigation modifications, turf replacement, and a 30‑day post‑construction landscape maintenance period. The project must comply with CDBG/Section 3 requirements, Buy‑America (BABA) provisions, prevailing‑wage rules, and Ban‑the‑Box ordinances, and includes extensive documentation (certified payrolls, waste‑log, environmental reports).
• Demolition of existing restroom building, concrete flatwork, and associated utilities.
• Installation of a prefabricated single‑stall restroom, new water, sewer, and electrical service connections, and a 12‑in. concrete mow band.
• Site grading, aggregate base placement, new concrete walkways, irrigation adjustments, turf sodding, and 30‑day landscape maintenance.
• Mandatory compliance with CDBG Section 3 labor reporting, Buy‑America preferences, prevailing‑wage certifications, and detailed waste‑recycling documentation.