This solicitation seeks a qualified contractor to execute Phase 3 demolition of existing pavement, sidewalks, and underground utilities at the Glenwood Resource Center campus in Glenwood, Iowa. The work includes full removal of concrete and asphalt surfaces, abandonment or removal of water, sewer, gas, and fuel lines, demolition of a 2,600 ft tunnel, clearing and grubbing, and proper disposal or recycling of materials. All demolition must comply with environmental, archaeological, and wet‑land protections, and the contractor must coordinate SWPPP, permits, and traffic control. The contract is a stipulated‑price bid with a submission deadline of 14 Oct 2026 and a substantial‑completion target of 1 Apr 2027.
• Remove ~68,000 SY of concrete and ~5,900 SY of asphalt, plus sidewalks, and stock‑pile for reuse.
• Abandon or remove extensive utility networks (water, sanitary sewer, storm sewer, gas, fuel‑oil) totaling tens of thousands of linear feet.
• Perform full tunnel demolition, site clearing, grubbing, and install temporary fencing, erosion‑control, and dust‑control measures.
• Must attend a mandatory pre‑bid conference (1 Oct 2026) and may attend an optional site walk (9 Oct 2026).