Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Hawaii guideHawaii Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Hawaii
  4. ›Closed bids
  5. ›Launiupoko Aquifer Well Development - Site L-1 Exploratory

County of Maui·Hawaii

Launiupoko Aquifer Well Development - Site L-1 Exploratory

Closes 10/28/2025$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Maui, Department of Water Supply, is soliciting bids for the Launiupoko Aquifer Well Development project, which involves drilling and testing two new 20-inch diameter exploratory wells. The project requires the construction of a 10,471-foot-long gravel access road and the installation of chain link fences and gates. The contractor will be responsible for furnishing all labor, tools, materials, and equipment necessary to complete the project. The contract time shall not exceed 360 calendar days, and the liquidated damages shall be $1,000 for each calendar day the contract time is exceeded. • The project involves drilling and testing two new 20-inch diameter exploratory wells. • The project requires the construction of a 10,471-foot-long gravel access road. • The contractor will be responsible for furnishing all labor, tools, materials, and equipment necessary to complete the project. • The contract time shall not exceed 360 calendar days. • The liquidated damages shall be $1,000 for each calendar day the contract time is exceeded.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ashley DeCastro(Bid Contact)

[email protected]

(808) 270-7680

Key dates

Opened
9/15/2025
Pre-bid meeting
10/2/2025
Closes
10/28/2025
Duration
360 days

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
221310
Solicitation №
DWS Job #20-01-A

Budget estimate

$500,000 – $2,000,000

Based on the scope of the project, which involves drilling and testing two new exploratory wells and constructing a gravel access road, the estimated budget could be in the range of $500,000 to $2,000,000. This estimate takes into account the cost of labor, materials, and equipment necessary to complete the project. The actual budget may vary depending on the bids received and the final contract award.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Maui·Hawaii

Top match · 71%

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

City of Dunedin·Florida

67% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

Hawaii Kahoʻolawe Island Reserve Commission·Hawaii

66% match

Conduct Water Study on Kaho`olawe Island

Closes 10/16/2026Opened 9/16/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

66% match

Water-Level and Quality Monitoring Wells

Closes 10/28/2026Opened 10/6/2026

County of Maui·Hawaii

66% match

Upper Waiko Road Sewer Extension and Waikapu Waterline Project

Closes 11/2/2026Opened 10/6/2026

Hawaii Department of Business, Economic Development and Tourism·Hawaii

66% match

Villages of Kapolei Groundwater Monitoring Services

Closes 11/2/2026Opened 10/1/2026

LA Water & Power·California

65% match

8003R1 North Hollywood Central Remediation Well Collector Line

Closes 10/21/2026Opened 10/1/2026

Georgia City of Statesboro·Georgia

65% match

Bruce Yawn Commerce Park Well

Closes 10/20/2026Opened 9/10/2026

Nevada Government·Nevada

65% match

Robinson Well Rehabilitation Project

Closes 10/15/2026Opened 9/10/2026

City of Santa Monica·California

65% match

Santa Monica Groundwater Basin Monitoring Program

Closes 10/26/2026Opened 9/28/2026

Tangipahoa Parish Government·Louisiana

65% match

PROJECT: 065 TANGIPAHOA PARISH STORMWATER DRAINAGE ENHANCEMENTS THROUGH CULERT MODIFICATIONS IN TICKFAW & MAUREPAS WATERSHEDS PROJECT

Closes 10/21/2026Opened 9/14/2026

City of Marysville, Ohio·Ohio

65% match

City of Marysville – New Well #7

Closes 10/22/2026Opened 9/23/2026

Connecticut City of Groton·Connecticut

65% match

WELL DRILLING SERVICES

Closes 10/19/2026Opened 9/28/2026

City of Lino Lakes·Minnesota

65% match

Well No. 7 Raw Watermain Extension

Closes 10/29/2026Opened 10/7/2026

Navajo Tribal Utility Authority·Arizona

64% match

NTUA PUMPHOUSE CONSTRUCTION FOR HOUCK WELL #4

Closes 10/19/2026Opened 10/2/2026

State of Hawaii Department of Transportation·Hawaii

64% match

ER-27(008) Kaumualii Hwy Drainage Imp Vic of Omao Stream Bridge

Closes 10/29/2026Opened 9/29/2026

City of Port St. Lucie·Florida

64% match

Hydrogeologist Consulting Services

Closes 10/21/2026Opened 9/2/2026

Alaska Department of Natural Resources, Division of Mining, Land and Water·Alaska

64% match

LAS 36107 KWH Constructors, Inc. Land Use Permit Application for Staging Antler Creek Pit

Rolling / TBD closeOpened 8/18/2026

Alaska Department of Natural Resources – Division of Mining, Land and Water (DMLW)·Alaska

64% match

LAS 36106 KWH Constructors, Inc. Land Use Permit Application for Staging McKinley Village Pit

Rolling / TBD closeOpened 8/18/2026

City of West Sacramento·California

64% match

Phase 1 Environmental Site Assessments for the West Sacramento Levee Improvement Program

Closes 10/26/2026Opened 9/28/2026

County of Hawaii·Hawaii

64% match

Kealakehe Wastewater Treatment Plant R-1 Upgrades

Closes 11/2/2026Opened 10/2/2026

Town of Eatonville·Florida

64% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·Hawaii

64% match

Relocate Schofield Barracks Deep Wells Above Ground, Building 1580, Schofield Barracks, Oahu, Hawaii

Closes 4/21/2027Opened 4/20/2026

City of Melbourne·Florida

64% match

Above Grade Wells 5 & 6

Closes 10/28/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

64% match

Sources Sought Wood River Relief Wells Construction

Closes 10/28/2026Opened 10/8/2026