The City of Orlando is seeking qualified contractors to perform soil stabilization pressure grouting at the 3814 Winderlakes Drive/Florida’s Turnpike site. The work includes mobilization/demobilization, bonding and insurance, indemnification, pre‑construction video documentation, maintenance of traffic, removal and repair of an existing sound wall, installation of grout piping, and placement of sand/cement grout. Bids must be submitted electronically via OpenGov by the stated deadline, and a non‑mandatory pre‑bid conference will be held on‑site.
• Scope: Pressure‑grout soil stabilization, sound‑wall removal/repair, traffic‑maintenance, and related site‑prep activities.
• Required items: Mobilization, bonds, insurance, indemnification, video documentation, traffic‑management plan, material quantities (≈13,320 LF grout pipe, 6,600 CY sand/cement grout, 150 LF sound‑wall removal, 20 SF sound‑wall repair).
• Submission: Electronic via OpenGov by 2:00 pm Oct 15 2026; pre‑bid conference Sep 24 2026 (non‑mandatory).
• Evaluation: Based on compliance with solicitation, pricing proposal, and required vendor questionnaires.