The University of Minnesota seeks a qualified construction firm to manage the complete build‑out of a new 1,500 sq ft 3D metal‑printer laboratory on the East Bank campus. The contractor will act as the construction manager, coordinate mechanical/electrical/plumbing (M/E/P) connections, oversee installation of owner‑provided printers and supporting equipment, maintain safe pedestrian pathways, and ensure minimal disruption to active academic spaces. The project budget is $1.2 M, with substantial completion required by 12 Mar 2027 and owner turnover by 2 Apr 2027.
• Scope: Full construction management, site logistics, M/E/P rough‑ins, equipment installation, safety and traffic control, coordination with university facilities and the architect (U+B Architecture & Design).
• Budget: Fixed lump‑sum contract of $1,200,000 (no escalation).
• Schedule: RFP issued 23 Sep 2026, pre‑proposal meeting 30 Sep 2026, questions due 5 Oct 2026, proposal due 12 Oct 2026, award expected 21 Oct 2026, authorization to proceed 26 Oct 2026, substantial completion 12 Mar 2027.
• Requirements: Prevailing‑wage compliance, safety score ≥ 5.0, responsible‑contractor certification, insurance and performance bonds, workforce/equal‑pay verification.
• Deliverables: Detailed project approach, CPM schedule, cost breakdown, team qualifications, compliance certifications.
• Location: Mechanical Engineering Department, 111 Church St SE, Minneapolis, MN 55455 (East Bank campus).