The City of Richland, Washington is soliciting qualified engineering consultants to develop complete construction‑ready plans and specifications for a series of Safe Routes to School (SRTS) improvements at multiple elementary school sites. The work includes civil design, traffic‑calming measures, signage, flashing beacons, raised crosswalks, ADA curb ramps, street lighting, and related field‑design support, as‑built documentation, and optional contract‑administration services. Submissions are due electronically by September 22, 2026, with project completion targeted for May 2027.
• Scope: Design and prepare bid‑ready construction documents for speed‑zone signage, flashing beacons, speed‑feedback signs, raised/high‑visibility crosswalks, ADA curb ramps, and street lighting at 15+ school locations.
• Deliverables: Construction plans, technical specifications, field‑design support, as‑built drawings, and possible construction contract administration.
• Schedule: RFQ issued Sep 6 2026 → Questions due Sep 17 2026 → Submissions due Sep 22 2026 → Evaluation Oct 2026 → Award intent Nov 2026 → Notice to proceed Dec 2026 → Work completed May 2027.
• Evaluation: 100 points based on completeness, project approach, firm experience, past performance, plus up to 50 interview points.
• Funding: Time‑and‑materials basis funded through the Safe Routes to School program (Climate Commitment Act).
• Required qualifications: Civil design experience, proficiency with Civil 3D/AutoCAD, familiarity with City of Richland standards, transportation planning, pedestrian safety, and ADA compliance.
• Contact: Barb Raney, Buyer, Purchasing Division (
[email protected], (509) 942‑7710).