Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Texas
  4. ›HPS Multi-Campus Foundation Repairs

Harmony Public Schools·Texas

HPS Multi-Campus Foundation Repairs

Closes 1/6/2027$500k – $2MRequest for Proposal
Get bids like this by emailBid source

Description

Harmony Public Schools (HPS) is soliciting sealed proposals from qualified general contractors to perform foundation repair, structural stabilization, drainage improvements, crack repair, and moisture‑control work at two Texas school campuses (Harmony School of Excellence – Dallas and Harmony Science Academy/Innovation – Euless). The scope includes installing piers, grading, drainage, crack remediation, and any related corrective work per engineering plans prepared by Momentum Structural Engineering. Contractors may bid on one or both “alternates” (each campus is an alternate). The contract is expected to be awarded after a board approval, with a contract signing target of 02/01/2027 and substantial completion required by 07/31/2027. Pre‑bid meeting is virtual on 10 Sep 2026 (optional). Questions are due 12/16/2026. Proposals are due 01/06/2027 via the HPS e‑bid system. The award may be split between two vendors or consolidated with one vendor covering both sites. • Work locations: Dallas, TX (8120 W Camp Wisdom Rd) and Euless, TX (701 S Industrial Blvd). • Core tasks: pier installation, site drainage grading, crack repairs, moisture control, and any additional structural corrective measures. • Contract type: sealed competitive RFP; must provide bonding, insurance, safety records, prevailing‑wage compliance, and asbestos‑free certification. • Timeline: contract sign by 02/01/2027; work to be completed by 07/31/2027 (≈6 months). • Mandatory documents: OSHA safety logs, loss analysis, bonding letters, insurance certificates, and final close‑out deliverables.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Hayati Ugur(Director of Facilities Management)

[email protected]

Key dates

Opened
9/23/2026
Questions due
12/16/2026
Pre-bid meeting
10/9/2026
Closes
1/6/2027
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
HPS2026DallasFoundationRepair Addendum 4

Budget estimate

$500,000 – $2,000,000

The scope covers full foundation repair and associated site work for two medium‑size school campuses. Comparable school foundation retrofit projects in Texas typically range from $500 K for a single campus to $2 M for multiple campuses, depending on extent of pier installation, drainage, and ancillary work. Assuming an average of 30–40 pier installations per site, grading, and ancillary repairs, a realistic contract value would fall between $0.5 M and $2 M. Factors influencing the final amount include the actual number of piers required, site‑specific drainage challenges, material costs, and bonding/insurance requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Harmony Public Schools·Texas

Top match · 99%

HPS Multi-Campus Foundation Repairs

Closes 1/6/2027Opened 9/23/2026

Harmony Public Schools·Texas

97% match

HPS Multi-Campus Foundation Repairs

Closes 1/6/2027Opened 9/23/2026

Harmony Public Schools·Texas

97% match

HPS Multi-Campus Foundation Repairs

Closes 1/6/2027Opened 9/23/2026

Harmony Public Schools·Texas

89% match

Houston District Canopies

Closes 10/20/2026Opened 9/3/2026

Harmony Public Schools·Texas

88% match

Houston District Canopies

Closes 10/20/2026Opened 9/3/2026

Harmony Public Schools·Texas

85% match

Waco Parking Lot

Closes 10/20/2026Opened 9/9/2026

Frisco ISD·Texas

82% match

Roofing Repair, Maintenance, and Waterproofing

Closes 12/4/2026Opened 9/25/2026

Frisco ISD·Texas

82% match

Roofing Repair, Maintenance, and Waterproofing

Closes 12/4/2026Opened 9/25/2026

Grayson College·Texas

81% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

Clear Creek ISD·Texas

81% match

CLCE, PARE, STWE PRIORITY REPAIRS

Closes 10/22/2026Opened 9/29/2026

Fort Worth ISD·Texas

81% match

CSP for TEA# 048- Polytechnic Pyramid Middle School Consolidation Site Renovations

Closes 11/11/2026Opened 9/24/2026

Texas HOUSTON CITY COLLEGE·Texas

81% match

Landscaping, Grounds and Irrigation Grounds Maintenance

Closes 10/20/2026Opened 9/17/2026

Clear Creek ISD·Texas

81% match

CLCE, PARE, STWE PRIORITY REPAIRS

Closes 10/22/2026Opened 9/29/2026

Houston ISD·Texas

80% match

Request for Proposals (RFP) - Electrical Maintenance and Repairs (Like for Like)

Closes 11/9/2026Opened 10/9/2026

Dallas County Hospital District d/b/a Parkland Health·Texas

80% match

RFP# 2019312 Soffit Panel Repair

Closes 10/14/2026Opened 9/9/2026

Chapel Hill ISD·Texas

80% match

Roofing Services

Closes 10/29/2026Opened 9/23/2026

Michigan Troy School District·Michigan

80% match

RFP2627-03 TSD Roofing Projects 2027

Closes 11/10/2026Opened 10/12/2026

Michigan Livonia Public Schools·Michigan

80% match

LPS Summer 2027 Roof Replacement Bid

Closes 10/28/2026Opened 10/8/2026

Round Rock ISD·Texas

80% match

CSP GATTIS ES & POND SPRINGS ES RENOVATIONS

Closes 10/15/2026Opened 9/23/2026

Michigan Ann Arbor Public Schools·Michigan

80% match

RFP 27.0005 District Wide Facade Improvements

Closes 10/30/2026Opened 10/9/2026

Loudoun County Public Schools·Virginia

80% match

2027 Roof Renovation Program - Seldens Landing ES

Closes 11/5/2026Opened 10/13/2026

Humble ISD·Texas

80% match

SERVICES, REPAIRS, MAINTENANCE, INSTALLATION-DISTRICT WIDE

Closes 11/2/2026Opened 8/13/2026

Sherman ISD·Texas

79% match

Maintenance, Transportation, and Security General Services

Closes 6/29/2030Opened 10/8/2026

Sherman ISD·Texas

79% match

Maintenance, Transportation, and Security General Services

Closes 6/29/2030Opened 9/10/2026