Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Sparks Avenue Sidepath Improvements Project

Town and County of Nantucket·Massachusetts

Sparks Avenue Sidepath Improvements Project

Closes 11/19/2026$500k – $2MInvitation for Bid
Get bids like this by emailBid source

Description

The Town of Nantucket’s Department of Public Works is seeking a qualified contractor to reconstruct and widen the sidepath along Sparks Avenue from Williams Lane to #38 Sparks Avenue. The contract is a lump‑sum award covering all labor, materials, equipment, traffic control, utility adjustments, curb and ramp construction, signage, erosion controls, and related site work. Bidders must submit electronic bids, a 5 % bid deposit, required insurance, prevailing‑wage compliance, and performance/payment bonds. The project must comply with Massachusetts prevailing‑wage rules and OSHA safety standards. • Scope includes hot‑mix asphalt sidepath reconstruction, granite curbing, concrete curb ramps, brick walk to high‑school fields, driveway and pavement repairs, new signage, catch basin and HDPE drain installation, steel‑backed timber guardrail, and temporary traffic control. • Mandatory bid documents: Tax Compliance Certification, Certificate of Non‑Collusion, proof of insurance, references, general bid form, agreement signature pages, bid deposit, prevailing‑wage payroll records, payment and performance bonds, and W‑9. • Pre‑bid site visit (non‑mandatory) on October 28, 2026 at the project intersection. • Questions due by November 3, 2026; answers posted by November 10, 2026. • Bid submission deadline: November 19, 2026, 2:00 PM (electronic). • Award expected within 30 days after bid opening.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Drew Patnode(Deputy Procurement Officer)

[email protected]

(508) 228-7244 Ext: 7512

Key dates

Opened
10/19/2026
Questions due
11/3/2026
Pre-bid meeting
10/28/2026
Site visit
10/28/2026
Closes
11/19/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-DPW-1009

Budget estimate

$500,000 – $2,000,000

The solicitation does not disclose a contract value. Based on typical municipal sidepath reconstruction projects of similar length (approximately a few hundred linear feet) that include asphalt, concrete, curb, signage, drainage, and utility work, a reasonable estimate ranges from $0.5 million to $2 million. Factors influencing the final amount include site conditions, material prices, scope extensions (e.g., additional utility work), and the contractor’s overhead/profit assumptions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Nantucket·Massachusetts

Top match · 93%

IFB - Sparks Avenue Sidepath Improvements Project

Closes 11/19/2026Opened 10/20/2026

Town and County of Nantucket·Massachusetts

87% match

Tom Nevers Road Multi-Use Path Project

Closes 11/17/2026Opened 10/14/2026

Connecticut Town of Voluntown·Connecticut

83% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

Massachusetts City of Greenfield·Massachusetts

83% match

2026 Paving Program

Closes 10/22/2026Opened 10/1/2026

City of Stillwater·Oklahoma

83% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

Georgia City of Statesboro·Georgia

83% match

ENG-92: WEST MAIN & EAST MAIN STREETSCAPE IMPROVEMENTS PROJECT

Closes 10/22/2026Opened 9/9/2026

Massachusetts City of Northampton·Massachusetts

83% match

DPW_ Bright Avenue Reconstruction and Utilities Replacement

Closes 11/4/2026Opened 10/14/2026

City of Rochester·New Hampshire

83% match

BID 27-10 Old Dover Road / Tebbetts Road Roundabout Project

Closes 12/2/2026Opened 10/16/2026

Massachusetts Department of Transportation·Massachusetts

82% match

610825 SHREWSBURY-NORTHBOROUGH FAP No. NHP(NHS)/PRC/HPP/VUS-0033(046) Rehabilitation & Box Widenin

Closes 10/27/2026Opened 8/31/2026

Massachusetts Town of Nantucket·Massachusetts

82% match

Nantucket Pier Repairs & Improvements

Closes 10/29/2026Opened 9/15/2026

Massachusetts Town of Nantucket·Massachusetts

82% match

IFB - Tom Nevers Road Multi-Use Path Project

Closes 11/17/2026Opened 10/14/2026

Town and County of Nantucket·Massachusetts

82% match

Town Pier Repairs & Improvements

Closes 10/29/2026Opened 9/16/2026

Georgia City of McDonough·Georgia

82% match

ROADWAY RESURFACING PROJECT LMIG-2024-26558-SUP

Closes 11/6/2026Opened 10/2/2026

City of Newberry, Florida·Florida

82% match

Invitation to Bid 2026-03, City of Newberry SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closes 10/27/2026Opened 9/21/2026

Town of Westwood·Massachusetts

82% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Town of Bluffton·South Carolina

82% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Massachusetts Department of Transportation·Massachusetts

82% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 10/27/2026Opened 9/14/2026

Connecticut Town of Colchester·Connecticut

81% match

DOT PATCH 226 NORWICH AVE

Closes 10/22/2026Opened 8/24/2026

Massachusetts Town of Barnstable·Massachusetts

81% match

REVISED Legal Ad Only:FY27 OCEAN STREET & GOSNOLD STREET IMPROVEMENTS

Closes 10/22/2026Opened 10/5/2026

Maryland State Highway Administration·Maryland

81% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Lawrence·Kansas

81% match

MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project

Closes 11/10/2026Opened 9/11/2026

Georgia Cherokee County Government·Georgia

81% match

2026-035, Arnold Mill Road Sidewalk Extension Project 81014

Closes 10/22/2026Opened 9/24/2026

City of Pueblo·Colorado

81% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

Connecticut Town of Colchester·Connecticut

81% match

DOT PATCH 63 NORWICH AVE

Closes 10/22/2026Opened 8/25/2026

Town of New Milford·Connecticut

81% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026