Californiaâs NEVI Formula Program provides a competitive grant to design, install, and operate public DC fastâcharging stations (4â20 CCSâ1 ports, âĽ150 kW each) along the stateâs Alternative Fuel Corridors. Applicants must submit a detailed project narrative, siteâspecific information, budgets, environmental (CEQA/NEPA) documentation, and a 20 % match share (âĽ50 % cash). The program caps total funding at $79 million, with a maximum award of approximately $27.7 million per applicant; stations must be publicly accessible 24/7 for a minimum of five years and located within one mile of an AFC offâramp, on previously disturbed land, and not on Caltransâowned property. Evaluation balances technical merit and costâperâCCSâport, with a required 70 % score on ProjectâReadiness and Budget criteria.
⢠Funded work: design, permitting, construction, and fiveâyear O&M of DC fastâcharging stations (up to 20 stations per award).
⢠Technical requirements: 4â20 CCSâ1 ports per station, OCPP 2.0.1, ISO 15118 compliance, BuyâAmerica (55 % domestic content waiver), cybersecurity plan, and âĽ97 % annual uptime.
⢠Mandatory deliverables: Project Narrative, Station Information spreadsheet, budget Excel, letters of commitment, preliminary site plan, CEQA worksheet, NEPA PES form, utility verification, resumes, and contact list.
⢠Funding: 80 % reimbursable grant, 20 % applicant match (cash âĽ50 % of match), with eligible costs limited to hardware, installation, related site work, and limited O&M/ workforceâdevelopment costs.