Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›South Commercial Street Water Main & E. Tabb Street Sanitary Sewer…

City of Harrisonville·Missouri

South Commercial Street Water Main & E. Tabb Street Sanitary Sewer Main (Add Alternate) Improvements

Closes 3/10/2026$250k – $350kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Harrisonville is seeking sealed bids for the construction of new water and sanitary sewer infrastructure on South Commercial Street and E. Tabb Street. The base bid covers over 800 ft of 8‑inch water main, including tees, valves, demolition, filling, grading, and site restoration. An additive alternate provides for an additional 400 ft of 8‑inch sanitary sewer main with similar demolition and restoration work. All work must comply with the city’s plans, specifications, and applicable Missouri statutes (prevailing wage, tax exemption, safety training, etc.). Bids must include a 5 % bid bond and may not be withdrawn for 90 days after opening. • 800 + ft of 8″ water main installation (including tees, valves, demolition, grading, restoration) • 400 + ft of 8″ sanitary sewer main installation (additive alternate) • Required compliance with prevailing‑wage law, tax‑exempt status provisions, federal work‑authorization affidavit, and OSHA‑type safety training The bid opening is scheduled for March 10, 2026 at 2:00 PM at City Hall.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carl Brooks(Director of Engineering)

[email protected]

(816) 380-8964

Key dates

Opened
2/9/2026
Questions due
3/2/2026
Pre-bid meeting
2/25/2026
Closes
3/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
237317-007

Budget estimate

$250,000 – $350,000

Based on typical municipal pipe‑installation costs (≈ $200–$250 per foot for 8″ water main and $250–$300 per foot for 8″ sewer), the 800 ft water segment could cost $160,000–$200,000, while the 400 ft sewer alternate could cost $100,000–$120,000. Adding design, mobilization, and contingency (≈ 15–20 % of direct costs) suggests a total contract value in the range of $250,000 to $350,000. The estimate assumes standard material prices in Missouri and does not account for potential site‑specific challenges that could raise the upper bound.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Abington·Massachusetts

Top match · 74%

Abington Central Street Water Main Improvements

Closes 10/28/2026Opened 10/7/2026

City of DeLand·Florida

71% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Town of South Hill·Virginia

71% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Rogers Water Utilities·Arkansas

71% match

Blossom Way Sewer Main Pauline Whitaker Dr. to Dixieland Rd

Closes 10/14/2026Opened 9/25/2026

North Carolina Orange Water & Sewer Authority·North Carolina

71% match

Brigham Road Water and Sewer Replacements

Closes 10/20/2026Opened 9/15/2026

City of Winchester·Virginia

70% match

Jefferson Street Water and Sewer Improvements

Closes 10/29/2026Opened 9/25/2026

Town of Blackstone·Virginia

70% match

Main Street Improvements Hodges Street- 10th Street - Addendum no. 1

Closes 10/13/2026Opened 10/8/2026

Nevada Government·Nevada

70% match

E Street & F Street Water Main Relocation

Closes 10/13/2026Opened 9/22/2026

Massachusetts Town of Agawam·Massachusetts

70% match

Main Street Sewer Rehab Project

Closes 10/14/2026Opened 9/30/2026

Hastings Utilities·Nebraska

69% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Hastings Utilities·Nebraska

69% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Georgia Ellijay-Gilmer County Water & Sewerage Authority·Georgia

69% match

South Main Street Lift Station

Closes 11/12/2026Opened 10/5/2026

Nevada Government·Nevada

69% match

E Street & F Street Water Main Relocation

Closes 10/13/2026Opened 9/22/2026

Trumbull County, OH·Ohio

69% match

CALEB ROAD SANITARY SEWER IMPROVEMENTS, PROJECT NO. 4-S-25

Closes 10/30/2026Opened 10/9/2026

Connecticut Town of South Windsor·Connecticut

69% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Massachusetts Town of Weymouth·Massachusetts

69% match

Main Street Sewer Easement Improvements

Closes 10/15/2026Opened 9/23/2026

Miami-Dade Water and Sewer Department·Florida

69% match

Furnish and Install 8-inch PVC C900 Force Main and 8-inch PVC C900 Water Main along SW 152nd St

Closes 10/26/2026Opened 9/15/2026

Moore & Bruggink, Inc·Michigan

69% match

East River Street Improvements – Spring Lake

Closes 10/28/2026Opened 9/30/2026

Catawba Regional Council of Governments·South Carolina

69% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Spartanburg Water·South Carolina

69% match

Rickert Avenue Waterline Improvements Project

Closes 10/13/2026Opened 9/14/2026

Georgia City of Lagrange·Georgia

69% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Dunedin·Florida

68% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

Gateway Services Community Development District·Florida

68% match

Sanitary Sewer Rehabilitation

Closes 10/21/2026Opened 9/18/2026

City of Woodland·California

68% match

Lemen Avenue Utility Improvements Project

Closes 10/13/2026Opened 9/23/2026