Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Construction
  5. ›Tuxedo Lane Drainage Improvements

City of Peachtree City·Georgia

Tuxedo Lane Drainage Improvements

Closes 11/17/2026$500k – $1MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Peachtree City is seeking qualified contractors to design‑build and install storm‑water drainage improvements along Tuxedo Lane and Smokerise Trace. The scope includes removal of existing 30‑in. CMP pipe, installation of approximately 825 LF of new 30‑in. reinforced concrete pipe (RCP) with one drop inlet and five junction boxes, replacement of an asphalt cart path, trench patching, structural modifications, and restriping of crosswalks. Bids are sealed, mandatory pre‑bid meeting required, and the contract will be awarded to the lowest responsive and responsible bidder. Work must be substantially completed within 60 calendar days of the Notice to Proceed, with final completion 30 days thereafter. Liquidated damages of $200 per day apply for delays. • Bid Number: 27‑103BSW • Publication: 10/15/2026; Closing: 11/17/2026 3:00 PM • Mandatory pre‑bid meeting: 10/29/2026 10:00 AM (on‑site) • Scope: 825 LF of 30‑in. RCP, drop inlet, 5 junction boxes, asphalt removal/replacement, trench work, crosswalk restriping • Bonds: 5 % bid security; Performance bond 100 % of contract; Payment bond 110 % • Schedule: 60 days to substantial completion, plus 30 days to final completion • Liquidated damages: $200 per day for each delay period • Contact: Angela Egan (Purchasing Agent), [email protected]

Attached files

Contact

Angela Egan(Purchasing Agent)

[email protected]

Key dates

Opened
10/15/2026
Pre-bid meeting
10/29/2026Mandatory
Closes
11/17/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
27-103BSW

Budget estimate

$500,000 – $1,000,000

The bid covers 825 ft of 30‑in. reinforced concrete pipe, associated fittings, drop inlet, junction boxes, removal and replacement of an asphalt cart path, trench excavation, backfill, and crosswalk restriping. Based on regional unit costs for 30‑in. RCP (approximately $150‑$200 per linear foot installed) the pipe portion alone is roughly $125,000‑$165,000. Adding excavation, backfill, asphalt work, traffic control, engineering oversight, bonds, and contractor overhead/profit typically adds 150‑200 % of material costs for a medium‑size municipal drainage project. Consequently, the total contract value is likely in the $500,000 to $1,000,000 range, depending on site conditions and any unforeseen utility conflicts.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Peachtree City·Georgia

Top match · 98%

Tuxedo Lane Drainage Improvement Project

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

86% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

City of Charlotte·North Carolina

86% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

Louisiana St. Tammany Parish Government·Louisiana

86% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

Town of Lexington·South Carolina

85% match

Cherry Ridge Drainage Improvements Project

Closes 10/29/2026Opened 10/14/2026

City of Charlotte·North Carolina

85% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

85% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

85% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

City of Charlotte·North Carolina

85% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Thousand Oaks·California

85% match

Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at Pembridge Street (MI 2623)

Closes 10/21/2026Opened 9/18/2026

City of Charlotte·North Carolina

85% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

85% match

Collective AJ Storm Drainage Improvement Projects

Rolling / TBD closeOpened 3/29/2026

City of Charlotte·North Carolina

85% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

84% match

718 Harwyn Dr. Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

City of Charlotte·North Carolina

84% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

Town of Lexington·South Carolina

84% match

CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2026Opened 10/14/2026

City of Charlotte·North Carolina

84% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

Town of Los Gatos·California

84% match

709 University Avenue Drainage System Replacement Project

Closes 10/28/2026Opened 10/1/2026

City of Charlotte·North Carolina

84% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

84% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

City of Charlotte·North Carolina

84% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of North Richland Hills·Texas

84% match

RFB 26-023 CHAPMAN ROAD PAVING, DRAINAGE, WATER AND SANITARY SEWER IMPROVEMENTS

Closes 10/20/2026Opened 9/25/2026

City of Charlotte·North Carolina

84% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

Georgia Department of Transportation·Georgia

84% match

T32-D5-Drainage-Various-193536

Closes 10/27/2026Opened 10/7/2026

City of Charlotte·North Carolina

84% match

Euclid Avenue 1818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027