The Town of Lexington is soliciting bids to replace a 500‑linear‑foot drainage system along Kwanzan Drive in the Cherry Ridge Subdivision, including storm‑drain pipe installation, utility relocation, demolition of existing pavement and structures, and resurfacing of the roadway. The contractor must coordinate with the town, utility providers, and a registered land surveyor, provide erosion‑control measures, and comply with SCDOT and local specifications. The work includes installation of catch basins, curb inlets, pipe (HDPE, ductile‑iron, reinforced concrete), back‑filling, grading, and final asphalt resurfacing, as well as post‑construction as‑built documentation.
• Scope: full storm‑drain replacement, utility locate/relocation, demolition, grading, erosion control, new HMA surface.
• Site: Kwanzan Drive, Cherry Ridge Subdivision, Lexington, SC.
• Key dates: Pre‑bid site visit 10/20/2026 (non‑mandatory), questions due 10/26/2026, bid opening 10/29/2026.
• Requirements: 72‑hour utility locate notice (811), coordination with town utility dept., compliance with OSHA, SCDOT, and environmental permits.
• Deliverables: installed drainage system, restored pavement, as‑built drawings, erosion‑control removal, final testing and certification.