Description
The City of Mobileâs Municipal Enforcement Department is seeking a qualified contractor to perform wetâmethod demolition and site remediation at 303 Rylands Street. The work includes tearing down existing structures, handling hazardous materials (leadâbased paint and asbestos), removing debris, implementing erosion and sediment control BMPs, and restoring the site with seeding and topsoil. All work must be completed within 30 calendar days of the Notice to Proceed, with strict documentation and closeâout requirements.
⢠Wet demolition of all woodâframe, CMU, concrete, and buried foundations, plus removal of vegetation, tires, and trash.
⢠Capping of sanitary sewer, water, and gas lines; handling of leadâbased paint and asbestos per EPA/AL regulations.
⢠Installation, maintenance, and removal of erosionâcontrol BMPs (silt fences, berms, dust control) and final site reseeding.
⢠Mandatory submission of preâaward documents (EâVerify, insurance, agreements) within 2 days of award and closeâout documentation (AIA forms, photos, newspaper notice).
⢠Liquidated damages of $250 per day apply after 45 days from the Notice to Proceed if the project is not completed.
Attached files
The solicitation documents live at the source â open the bid source above to download them.