Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›Purchase of Vault Type, 15kV Solid Dielectric Switchgear Assemblies

University of Minnesota·Minnesota

Purchase of Vault Type, 15kV Solid Dielectric Switchgear Assemblies

Closes 11/21/2025$150k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota is seeking bids for the purchase of two vault type, 15kV solid dielectric switchgear assemblies. The assemblies must meet specific requirements, including being suitable for use in a vault, having all switches and associated components mounted to a common frame, and being fully dead-front when installed. The assemblies must also have means for vertical lifting and be capable of floor mounting. The university requires the manufacturer to provide a standard 24-month warranty against defects in materials and workmanship. The bid submission deadline is November 21, 2025, at 2:00 PM CT. Some key points to consider include: • The switchgear assemblies must be designed to carry a continuous current of 600 amps • The assemblies must have a copper ground bus securely attached to the front of the switch assembly • The manufacturer must provide certified copies of all factory production test reports prior to delivery • The assemblies must be shipped on a fully enclosed truck and delivered to the University of Minnesota • The manufacturer must provide a complete set of shop drawings, including dimensioned plan, elevation, and section drawings, single line diagram, equipment ratings, and wiring diagrams

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Marsha West

[email protected]

Key dates

Opened
11/7/2025
Questions due
11/14/2025
Closes
11/21/2025

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
335313
Solicitation №
10303.2025.06.11.mw Addendum 1

Budget estimate

$150,000 – $500,000

The budget for this opportunity can be estimated based on the cost of the switchgear assemblies and the scope of work. The cost of a single switchgear assembly can range from $50,000 to $200,000, depending on the complexity and specifications. Since the university is purchasing two assemblies, the total cost can be estimated to be between $100,000 and $400,000. Additionally, the cost of shipping, installation, and testing may add to the overall budget. Therefore, a reasonable estimate for the budget is between $150,000 and $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richland·Washington

Top match · 72%

Metalclad Switchgear - Sandhill Crane Substation Bank 3

Closes 11/3/2026Opened 9/27/2026

The City of Hamilton, OH·Ohio

72% match

Switchgear Purchase – Contract #26‑39 – City of Hamilton, Ohio

Closes 10/26/2026Opened 9/28/2026

City of Lakeland·Florida

68% match

Annual 15KV CIRCUIT BREAKER MULTI-YEAR AGREEMENT

Closes 10/26/2026Opened 9/28/2026

LA Water & Power·California

67% match

146875 CIRCUIT BREAKER, HGS-MEDIUM VOLTAGE

Closes 10/16/2026Opened 10/2/2026

Chelan County PUD·Washington

67% match

115 kV Circuit Breakers

Closes 10/22/2026Opened 9/29/2026

City of Ruston·Louisiana

67% match

Purchase of New Three‑Phase 15.5 kV MV Vacuum 2000 Amp Main Circuit Breakers

Closes 10/28/2026Opened 9/18/2026

U.S. Department Of Defense·United States of America

66% match

59--SWITCH ASSEMBLY

Closes 10/22/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

66% match

59--SWITCH ASSEMBLY

Closes 10/18/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

66% match

59--RELAY,SOLID STATE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·Pennsylvania

66% match

SWITCH ASSEMBLY

Closes 10/26/2026Opened 9/9/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Provide Switchgear & Control System Modification – Five Points Correctional Facility (46151‑E Electrical)

Closes 10/21/2026Opened 9/23/2026

Alabama State Port Authority·Alabama

65% match

BID – McDuffie Main 25 kV Switchgear Upgrade

Closes 10/22/2026Opened 9/1/2026

Snohomish County PUD·Washington

65% match

Getchell Switching Station Structures and Fasteners

Closes 10/16/2026Opened 10/1/2026

U.S. Department Of Energy·New York

65% match

Current Source Pulse Generator & Mounting Kit, No Substitutions or Equivalents

Closes 10/14/2026Opened 10/6/2026

U.S. Department Of Defense·Ohio

65% match

59 - Switch, Solid State

Closes 11/9/2026Opened 12/10/2025

Corrections and Community Supervision, NYS Dept. of·New York

65% match

Electrical switchgear maintenance and Partial discharge testing

Closes 11/18/2026Opened 7/28/2026

U.S. Department Of Defense·United States of America

65% match

59--SWITCH,ELECTRONIC

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

65% match

59--SWITCH ASSEMBLY

Closes 10/22/2026Opened 10/12/2026

U.S. Department Of Defense·Pennsylvania

65% match

CIRCUIT BREAKER

Closes 10/15/2026Opened 9/11/2026

U.S. Department Of Defense·Pennsylvania

65% match

CIRCUIT BREAKER

Closes 10/23/2026Opened 4/23/2026

Hastings Utilities·Nebraska

65% match

DHPC PDC 13.8KV Switchgear (Re-bid) HU 2026-49

Rolling / TBD closeOpened 9/4/2026

U.S. Department Of Defense·United States of America

65% match

10--SWITCH ASSEMBLY,ELEVAT

Closes 10/15/2026Opened 10/1/2026

U.S. Department Of Defense·Ohio

65% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·Ohio

64% match

10--SWITCH ASSEMBLY,ELEVAT

Closes 10/16/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

64% match

CIRCUIT BREAKER

Closes 10/30/2026Opened 10/1/2026