The Bureau of Reclamation is conducting a SourcesâSought/Industry Day for the Conconully Dam Seismic Modification project in Washington State. The effort will modernize dam safety through extensive civilâengineering work, including deep soil mixing, stability berm construction, outletâworks tunnel upgrades, and associated infrastructure (roads, power, fiber, and security). The agency is gathering market interest and technical capability information from firms experienced in dam modifications, geotechnical construction, hydraulic structures, and related disciplines. A mandatory (but not required for award) Industry Day on 21 Oct 2026 will provide technical briefings, site access, and a forum for questions. The anticipated contract will be solicited in late FY 2027/early FY 2028, with an estimated value of $80â$100 million and a performance period of roughly three years.
⢠Project location: Conconully Dam, Conconully, Washington
⢠Scope includes power/fiber coordination, site clearing, instrument removal, earthwork, deepâsoil mixing (â70 ft depth), stability berm (â500,000 cy), outletâworks tunnel lining, valve house construction, rock excavation, road and security gate construction, and final site restoration
⢠Estimated ROM: $80 M â $100 M
⢠Anticipated solicitation: late FY 2027 / early FY 2028; period of performance ~3 years
⢠Industry Day (preâbid) on 21 Oct 2026 (8:30 a.m.â1:00 p.m. PDT) with site tour
⢠Questions due: 30 Sep 2026 (5 p.m. MDT) via email to Brock Palen and Lance Fleming
⢠Primary contact: Lance Fleming, Bureau of Reclamation (
[email protected], (208) 378â5338)