Description
The City of El Cajon is seeking a qualified contractor to perform comprehensive upgrades to its Septic Waste Hauler Facility, including demolition, earthwork, drainage installation, concrete paving, steel canopy erection, and associated electrical work. The contract requires a 10 % bid bond, performance and labor/material bonds equal to 100 % of the contract price, and strict compliance with water‑pollution control, safety, and prevailing‑wage requirements. The project must be completed within 80 working days, with liquidated damages of $3,600 per day for overruns.
• Mobilization, demolition, and site grading to prepare for new infrastructure.
• Installation of French drains, Brooks boxes, PVC storm‑drain systems, and PCC sidewalks/curbs/berms.
• Fabrication and erection of a steel canopy with integrated lighting and utility accommodations.
• Complete electrical conduit, wiring, and flood‑lighting installation, plus coordination with multiple local utilities.
• Mandatory environmental, safety, and quality‑assurance submittals (WPCP/SWPPP, shoring plans, certified payroll).
Attached files
The solicitation documents live at the source — open the bid source above to download them.