Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›South Carolina
  4. ›Branchcliff Lane Streambank Stabilization

City of Anderson·South Carolina

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026$500k – $1.2MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Anderson is seeking a contractor to perform comprehensive streambank stabilization along Branchcliff Lane, which includes grading, installation of protective boulder structures, erosion control, revegetation, and full replacement of gravity sanitary sewer lines and manholes. This design‑bid‑build procurement requires furnishing all materials, equipment, and labor to restore the site to functional condition while protecting the streambank from future erosion. • Grading and soil stabilization with boulder toe protection and J‑hook structures • Installation of erosion and sediment control measures and revegetation • Removal and replacement of gravity sanitary sewer infrastructure and associated manholes

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Alex Kostik(Agency Project Coordinator)

[email protected]

(864) 231-5931

Key dates

Opened
10/12/2026
Closes
11/2/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2026-10

Budget estimate

$500,000 – $1,200,000

Based on typical costs for streambank stabilization (approximately $150‑$250 per square foot) combined with sewer line replacement (around $100‑$150 per linear foot) and assuming a moderate project length of 5,000 sq ft of bank and 2,000 ft of sewer, the total contract value is likely to fall between $500,000 and $1.2 million. Factors influencing the range include material grades, site access, and the extent of revegetation required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Sustainable Woodstock·Vermont

Top match · 82%

Barnard Brook at Woodstock Garden Bank Stabilization

Closes 10/20/2026Opened 9/17/2026

Maryland Charles County Government·Maryland

82% match

ITB 27-009 NPDES Oak Ridge Park East Stream Restoration

Closes 10/20/2026Opened 9/18/2026

City of Austin·Texas

82% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

Massachusetts Town of Brewster·Massachusetts

82% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Defense·Texas

82% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

Maryland Chevy Chase Village·Maryland

81% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 10/20/2026Opened 9/30/2026

City of Colorado Springs·Colorado

81% match

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026Opened 10/9/2026

City of Charlotte·North Carolina

81% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

Georgia Bulloch County Board of Commissioners·Georgia

81% match

Anderson Cemetery Road Drainage and Paving Project

Closes 10/16/2026Opened 9/24/2026

Pinellas County·Florida

81% match

Ridgewood Estates Sewer Improvements Project and 82nd Avenue & 113th Street Water Main Improvements Project (PID 003204I & PID 006170A)

Closes 10/13/2026Opened 10/2/2026

City of Anderson·South Carolina

81% match

Generostee Creek WWTP & Rocky River WWTP Geomembrane Liner Replacement

Closes 11/4/2026Opened 10/6/2026

James City County·Virginia

81% match

Landing Circle Stream Restoration

Closes 10/21/2026Opened 9/23/2026

City of Walterboro·South Carolina

81% match

Middle Ireland Creek Sewer Trunk Line Rehabilitation

Closes 10/27/2026Opened 9/25/2026

Georgia City of Covington·Georgia

81% match

2026-21 Newton Drive Storm Drainage Improvements Project

Closes 10/13/2026Opened 8/24/2026

Johnson County·Kansas

81% match

81st Street and Nieman Road Stream Crossing Repairs – Contract No. SMTC-C046

Closes 10/30/2026Opened 9/29/2026

U.S. Department Of Defense·Texas

81% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

Maryland City of Gaithersburg·Maryland

81% match

Construction Services for Rabbitt Road Stream & Vegetative Buffer Restoration

Closes 10/28/2026Opened 9/18/2026

Georgia City of Covington·Georgia

80% match

#2026-20 Pace Street Floodplain Restoration

Closes 10/20/2026Opened 8/17/2026

Mississippi

80% match

Erosion Control Measures on New Zion Road – Emergency Watershed Protection

Closes 10/19/2026Opened 10/1/2026

Johnson County Wastewater·Kansas

80% match

81st Street and Nieman Road Stream Crossing Repairs – Contract No. SMTC-C046

Closes 10/30/2026Opened 9/29/2026

City of Charlotte·North Carolina

80% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

Ohio University·Ohio

80% match

OUL Fetters Run Erosion Control Improvements Phase 1

Closes 10/13/2026Opened 9/16/2026

City of Charleston·South Carolina

80% match

Infrastructure Improvements in the Dupont-Wappoo Watershed

Closes 10/16/2026Opened 9/28/2026

City of Charlotte·North Carolina

80% match

Bruns Academy Water Quality Enhancement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

80% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028