The City of Rancho Palos Verdes is seeking a qualified contractor to perform traffic‑calming striping, sign installation, removal of existing markings, and related pavement work along Miraleste Drive (Palos Verdes Drive East to 1st Street). The scope includes mobilization, temporary traffic control, removal of existing striping/markings, installation of new thermoplastic lane striping, green bicycle lane markings, crosswalks, signs, delineators, and bott’s dots, all completed within a 30‑working‑day schedule. The contract is a fixed‑price, public‑works construction award with required performance and payment bonds, prevailing‑wage compliance, and strict traffic‑control and safety penalties.
• Work type: traffic‑control and pavement‑marking construction (no paving).
• Estimated duration: 30 working days; work hours 9 am‑3 pm, Mon‑Fri.
• Mandatory submissions: bid bond ≥ 10 % of total bid, full insurance/bond package, completed bid forms, resumes, references, and non‑collusion declaration.
• Key compliance: sealed traffic‑control plan, CALGreen C&D waste diversion ≥ 65 %, utility coordination (811 call 48 hr), ADA lane width, and daily/weekly reporting.
• Penalties for delays, non‑compliance, and prevailing‑wage violations may total several thousand dollars per day.