Veeder Root TLS450 PLUS Upgrade Minot AFB, ND
Title:  

Veeder Root TLS450 PLUS Upgrade Minot AFB, ND

Agency:  

U.S. Department Of Defense

State:  

North Dakota

NAICS Code:  

334519

Industry:  

Aerospace and Defense

Solicitation Type:  

Request for Quotation

Solicitation ID:  

FA4528-25-Q-SP02

Open Date:  

7/1/2025

Pre-Bid Meeting Date:  

7/24/2025(Mandatory)

Questions Due Date:  

7/30/2025

Close Date:  

8/8/2025

Project Duration:  

545 days

Last Updated:  

7/14/2025

Description:
The Department of the Air Force, 5th Contracting Squadron - Minot AFB, ND is seeking a contractor to purchase and install replacement of existing Veeder Root 350PLUS to Veeder Root 450PLUS systems in one (1) Squadron of five (5) Missile Alert Facilities (MAF) and fifty (50) Launch Facilities (LFs). The contractor must have the following minimum training certificates to install and set up the equipment: Level 2 or 3 Service Technician Certification and Level 1 - Installer Certification. The contractor must also have a North Dakota licensed master electrician on-site working and must be physically on site during electrical installations. • The work shall include but is not limited to the replacement of the existing Veeder Root 350/350PLUS fuel monitoring systems with the new Veeder Root 450PLUS systems. • All wiring shall be replaced with the Veeder Root network. • The contractor is to follow all Veeder Root requirements for proper installation and setup. • The contractor shall comply with applicable Occupational Safety and Health Administration (OSHA) directives. • The conduit must be properly sealed in accordance with the latest National Electric Code (NFPA 70) and the Code for Motor Fuel Dispensing Facilities and Repair Garages (NFPA 30A).
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Sherry L. Platt(Point of Contact)

sherry.platt.1@us.af.mil

(701) 723-4180

Budget Estimate (AI):

$2,000,000 – $9,500,000

The budget for this contract can be estimated based on the scope of work, which includes the replacement of existing Veeder Root 350PLUS to Veeder Root 450PLUS systems in one (1) Squadron of five (5) Missile Alert Facilities (MAF) and fifty (50) Launch Facilities (LFs). The cost of the equipment, labor, and any additional requirements such as training and certification will influence the budget. Assuming an average cost of $10,000 to $50,000 per system, the total cost for 15 MAFs and 150 LFs could range from $1.5 million to $7.5 million. Additionally, the cost of labor, training, and certification may add another $500,000 to $2 million. Therefore, the estimated budget range is $2 million to $9.5 million.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.