The City of Burlington’s Department of Public Works – Water Resources Division is seeking qualified manufacturers to supply, deliver, install, start‑up, test, and train on a new aeration blower for the North Wastewater Facility. Bidders may propose Hybrid Tri‑Lobe, Non‑Hybrid Tri‑Lobe, or Integrally Geared Centrifugal blower types, and can submit separate packages for each type. The contract includes equipment procurement, two‑month lead time for delivery, a two‑day on‑site start‑up and performance testing visit, and comprehensive operator training. Proposals must be submitted electronically by November 6, 2026, with questions due by October 26, 2026. Evaluation criteria include capital cost, turn‑down potential, total cost of ownership, availability, references, and equipment fit. • Provide blower(s) meeting attached specifications (Hybrid/Non‑Hybrid Tri‑Lobe or Geared Centrifugal). • Deliver equipment, allow 2‑month lead time before start‑up. • Conduct on‑site start‑up, performance testing, and a two‑day training session. • Submit required submittals: shop drawings, O&M manuals, certifications, insurance, and proof of Vermont registration. • Meet pre‑qualification, insurance, bonding, and livable‑wage ordinance requirements.