Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Muscoy Area Rehabilitation - Phase 1

San Bernardino County·California

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026$5M – $10MInvitation for Bid
Get bids like this by emailBid source

Description

This solicitation seeks a qualified contractor to execute Phase 1 of the Muscoy Area Rehabilitation project in San Bernardino County, CA. The work encompasses extensive road‑surface rehabilitation, ADA‑ramp reconstruction, and traffic‑signal upgrades across multiple arterial streets. The contractor must submit a fully executed proposal containing unit‑price and lump‑sum line items, provide a bid security of at least 10 % of the total bid, and comply with all County, Caltrans, and state regulations (including CARB, DIR, and prevailing‑wage requirements). • Road resurfacing: milling, cold‑plane asphalt, rubberized chip‑seal, slurry‑seal, and multilayer seal‑coats. • ADA‑compliant curb‑access ramp demolition and reconstruction, including detectable warning surfaces. • Traffic‑signal modifications: controller upgrades, loop replacements, and restriping with thermoplastic markings. • Mandatory documentation: non‑collusion declaration, CARB off‑road diesel certification, D‑U‑N‑S number, and E‑Pro vendor registration. • Bid opening 12 Dec 2026, award expected within 90 days; construction to commence within 15 days of notice to proceed.

Attached files

Contact

Marissa Tellez(Contracts)

[email protected]

(909) 387-7920

Key dates

Opened
10/27/2026
Questions due
11/20/2026
Pre-bid meeting
11/18/2026
Closes
12/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PWG127-LANDD-6584

Budget estimate

$5,000,000 – $10,000,000

The solicitation does not disclose a total contract value, but similar county roadway‑rehab contracts in Southern California typically range from $5 million to $12 million based on length of pavement, material quantities (tens of thousands of tons of asphalt and aggregate), and ancillary work (ADA ramps, signal upgrades). Considering the extensive resurfacing quantities listed in the plans and the inclusion of multiple treatment groups, a reasonable ball‑park estimate for the total awarded amount is $5 M–$10 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Modoc County Road Department·California

Top match · 85%

FOR CONSTRUCTION OF MODOC COUNTY ROAD 1 REHABILITATION PROJECT FROM THE INTERSECTION OF COUNTY ROAD 9 TO THE B.L.M. BOUNDARY

Closes 11/12/2026Opened 10/1/2026

San Bernardino County·California

84% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

County of Orange·California

84% match

Modjeska Grade Road, Road and Drainage Improvements

Closes 11/3/2026Opened 10/13/2026

Bay County·Florida

84% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Bay County, FL·Florida

83% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

City of Pacific Grove·California

83% match

NOTICE INVITING SEALED BIDS - FY 2025/2026 STREET REHABILITATION PROJECT DEL MONTE BLVD, 10TH ST, BEACON AVE

Closes 11/12/2026Opened 10/12/2026

Lowndes County·Georgia

83% match

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026

City of Morgan Hill·California

83% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

Siskiyou County California·California

83% match

Jackson Ranch Road Rehabilitation

Closes 11/11/2026Opened 4/24/2026

City of Redlands·California

83% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

The City of Anaheim·California

83% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Fort Myers·Florida

82% match

Asphalt Roadway Resurfacing and Rehabilitation

Closes 11/2/2026Opened 10/1/2026

City of Murfreesboro·Tennessee

82% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

California Department of Transportation·California

82% match

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Closes 11/10/2026Opened 9/21/2026

City of Redlands·California

82% match

PMP 2026 Street Resurfacing Project

Closes 10/29/2026Opened 10/8/2026

City of Corning·California

82% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

Missouri Department of Transportation·Missouri

82% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

San Joaquin County Department of Public Works·California

82% match

Main Street Resurfacing, Federal Aid Project No. STPL‑5929(334)

Closes 11/5/2026Opened 10/6/2026

Marion County·South Carolina

82% match

Marion County Paving Project

Closes 11/17/2026Opened 10/22/2026

Los Angeles County Public Works·California

82% match

RMDJOC6788 Pavement Reconstruction (Sustainable) North Los Angeles County

Closes 11/3/2026Opened 10/6/2026

City of Modesto, CA·California

82% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 11/3/2026Opened 9/1/2026

City of Morgan Hill·California

81% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

California High‑Speed Rail Authority·California

81% match

HSR26-81 Request for Proposals for Repair and Construction Projects. Multiple Award Task Order (MATOC) On-Ramp

Closes 12/16/2026Opened 10/22/2026

Town of Church Point·Louisiana

81% match

2026-27 ROAD IMPROVEMENTS PROJECT PHASE 1

Closes 11/10/2026Opened 10/14/2026

County of Los Angeles Department of Public Works·California

81% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026