Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL…
More bids in Illinois →

U.S. Department Of Defense·Illinois

W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL BOLTED TAINTER GATE FABRICATION

Closes 9/17/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers (Rock Island District) seeks a qualified vendor to fabricate and deliver bolted Tainter gates for Lock and Dam 21 on the Mississippi River at Quincy, Illinois. The gates are approximately 20 ft high by 64 ft long, constructed from cold‑rolled steel shapes and welded assemblies that must meet AWS D1.1 welding standards and be designed without fracture‑critical members. Work is off‑site fabrication only; delivery to the lock site is included. The solicitation provides a CADD model upon request. • Fabrication of large‑scale steel Tainter gates (≈20 ft × 64 ft) • Cold‑rolled steel shapes, welded per AWS D1.1 • No fracture‑critical members – enhanced reliability • Off‑site manufacturing and delivery to Lock & Dam 21, Quincy, IL • Contact for CADD model: Joseph Porter (USACE)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joseph Porter

[email protected]

(309) 794-5333

Key dates

Opened
8/20/2026
Closes
9/17/2026

Last updated

Details

Type
Request for Proposal
Industry
Manufacturing
NAICS
332312
Solicitation №
W912EK26BA014

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed in the solicitation. Based on the size of each gate (≈20 ft × 64 ft), the use of high‑grade structural steel, AWS D1.1 welding, and the logistics of delivering oversized metal assemblies, a reasonable ballpark for a single gate is $500,000‑$800,000. Assuming the award may include two gates (common for a lock), the total contract value could range from roughly $1 million to $1.6 million. Factors influencing the final amount include material price fluctuations, the exact number of gates required, and any additional testing or certification requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Illinois

Top match · 77%

Illinois River Basin, Brandon Road L&D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication

Closes 10/13/2026Opened 10/6/2026

U.S. Department Of Defense·Missouri

71% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 11/16/2026Opened 10/6/2026

U.S. Department Of Defense·Illinois

70% match

PRESOLICITATION NOTICE FOR GATE HOIST MACHINERY PAINTING AND HOIST HOUSE REHABILITATION FOR FOX RIVER DAMS, WISCONSIN

Closes 7/16/2029Opened 7/16/2026

U.S. Department Of Defense·Washington

70% match

Sources Sought: Albeni Falls Dam Spillway Gate Replacments

Closes 4/29/2028Opened 4/17/2025

Iowa Department of Administrative Services·Iowa

70% match

IMCC Vehicle Gate 1, 1A & 18 Replacements

Closes 11/10/2026Opened 10/11/2026

Lower Platte North Natural Resources District·Nebraska

69% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

U.S. Department Of Defense·Oregon

69% match

Sources Sought: The Dalles Dam Gate Repair Pit Fire Protection and Life Safety Upgrades

Closes 10/15/2026Opened 9/28/2026

U.S. Department Of Defense·Illinois

69% match

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1

Closes 10/26/2026Opened 9/22/2026

Tennessee Department of Environment & Conservation·Tennessee

69% match

Chickasaw Stem Replacement and Riser Gate Repair

Closes 10/22/2026Opened 10/7/2026

Louisiana McNeese State University·Louisiana

69% match

Campus Gateways

Closes 10/21/2026Opened 9/17/2026

North Carolina City of Rocky Mount·North Carolina

69% match

North Bascule Gate Hydraulic Cylinder Installation

Closes 10/19/2026Opened 10/5/2026

Iowa Department of Administrative Services·Iowa

69% match

IMCC Vehicle Gate 1, 1A & 18 Replacements

Closes 11/10/2026Opened 10/9/2026

City of Des Moines·Iowa

68% match

Westside Basin Knife Gate Valve Rebuild

Closes 10/14/2026Opened 9/23/2026

U.S. Department Of Defense·Kentucky

68% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

City of Minneapolis·Minnesota

67% match

BID-PW-Resilient Wedge Gate Valves with Manual Act

Closes 10/20/2026Opened 10/6/2026

Ramsey County·Minnesota

67% match

TAMARACK NATURE CENTER GATE AND SIGN

Closes 10/22/2026Opened 9/23/2026

Lower Platte North Natural Resources District·Nebraska

67% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

U.S. Department Of Defense·Oregon

67% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 7/6/2026

U.S. Department Of Defense·Missouri

67% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 1-2025

Closes 4/21/2027Opened 4/22/2025

Tarrant Regional Water District·Texas

67% match

Eagle Mountain Office - Fence and Gate Additions for Fuel Island Project

Closes 11/3/2026Opened 10/13/2026

Neel-Schaffer, Inc·Mississippi

67% match

NS.19082 SAP-57(17)M Horace Holmes Drive & Jaguar Trail#20942

Closes 10/15/2026Opened 9/12/2026

U.S. Department Of Defense·Missouri

67% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 11/16/2026Opened 3/31/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025

Closes 3/18/2028Opened 3/18/2026