The City of Fayetteville is seeking a qualified contractor to design and construct comprehensive drainage, water‑main, sanitary‑sewer, and roadway improvements along Sessoms Street and adjacent corridors. The work includes removal and replacement of storm‑drain pipes, water‑main relocation, ductile‑iron sewer replacement, pavement demolition and new concrete pavement, curb‑and‑gutter reinstatement, erosion‑control measures, and utility coordination. The contract is for a lump‑sum amount with a 300‑day performance period, and the base‑bid value is listed at approximately $1.73 M.
• Scope covers storm‑drain system upgrades, new 16‑in. water main, large‑diameter (42‑in.) reinforced‑concrete pipe, and sanitary sewer replacement.
• Includes extensive site preparation, temporary shoring, erosion/sediment control, traffic‑control planning, and final restoration of right‑of‑way.
• Mandatory bid security (5 % of bid), required subcontractor certifications (SDBE, E‑Verify, de‑barment questionnaire, etc.), and adherence to city and NCDOT specifications.
• Pre‑bid conference on Sep 10, 2026 (attendance encouraged); bid deadline extended to Oct 8, 2026 2 PM.
• Anticipated Notice‑to‑Proceed in February 2027; contract duration 300 calendar days with substantial completion by day 270.