Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Application to Test in the NRIC DOME Facility
More bids in Idaho →

U.S. Department Of Energy·Idaho

Application to Test in the NRIC DOME Facility

Closes 6/19/2026$500k – $5M
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Reactor Innovation Center (NRIC) and the Idaho National Laboratory (INL) are seeking applications from industry applicants to test advanced reactor experiments in the Demonstration of Microreactor Experiments (DOME) test bed facility. The facility is expected to be ready for use after the first reactor experiment is complete, projected July 2027. Applicants must demonstrate a level of project maturity commensurate with significant progress through conceptual design of the proposed reactor and DOE agreement or engagement on the proposed reactor Nuclear Safety Design Agreement (NSDA) or 10 CFR 830 safety basis equivalent. The applications will include detailed information in several categories, including reactor technology maturity, nuclear material feedstock/fuel, reactor test objectives, project schedule, and commercialization and regulatory plan. • The application must be no more than 50 pages in length in PDF format, plus an attached Master Document and Deliverable List (MDDL) and schedule. • The application must include sufficient written information confirming the responder’s qualifications and addressing each of the opportunity evaluation criteria listed in GDE-55115. • The decision to schedule the DOME facility for an advanced reactor experiment will rely on the assessments of qualified applications. • NRIC will make a testing sequence recommendation to DOE that optimizes the use of DOME. • DOE will determine the schedule of experiments in DOME.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

AnnMarie Marshall(Primary Contact)

[email protected]

Key dates

Opened
4/29/2026
Questions due
6/5/2026
Closes
6/19/2026

Last updated

Details

Industry
Energy and Utilities
NAICS
221113
Solicitation №
INL-NRICRFA02

Budget estimate

$500,000 – $5,000,000

The budget for this opportunity is not explicitly stated, but it can be estimated based on the scope of the project. The development and testing of advanced reactor experiments can be a costly endeavor, and the selected applicant will be responsible for the financial costs of the project. A rough estimate for the budget could be in the range of $500,000 to $5 million, considering the complexity and the resources required for the project. However, this is a very rough estimate and the actual budget could be higher or lower, depending on the specific requirements and the selected applicant's proposal.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Nuclear Regulatory Commission·Maryland

Top match · 68%

Radiological Evaluation Assistance (REA)

Closes 12/5/2026Opened 11/17/2025

U.S. Department Of Defense·United States of America

66% match

INDUSTRY PARTNERSHIP OPPORTUNITY: U.S. Army Test and Evaluation Command (ATEC) Announces Availability of Premier National Test Ranges

Closes 9/30/2027Opened 12/19/2025

National Aeronautics And Space Administration·Texas

66% match

Research Opportunities for International Space Station (ISS) Utilization

Closes 9/30/2030Opened 4/8/2026

National Aeronautics And Space Administration·Mississippi

66% match

Dome Loaded Regulator

Closes 10/13/2026Opened 10/6/2026

U.S. National Institutes of Health·United States of America

65% match

Integration of Imaging and Fluid-Based Tumor Monitoring in Cancer Therapy (R01 Clinical Trial Optional)

Closes 1/7/2028Opened 11/6/2024

U.S. Department Of Defense·Massachusetts

65% match

Individual Water Treatment Device (IWTD) Laboratory Testing

Closes 11/12/2026Opened 10/8/2026

U.S. Department Of Defense·New Jersey

65% match

Aircraft Pressurized Cabin Leakage Tester (APCLT)

Closes 10/13/2026Opened 10/6/2026

Salisbury University·Maryland

65% match

test RFP

Rolling / TBD closeOpened 1/26/2026

U.S. Idaho Field Office·United States of America

65% match

RFI - DOE Infrastructure Work Scope Development

Rolling / TBD closeOpened 1/14/2016

U.S. Department Of Defense·Virginia

65% match

RFI for Next Generation Hypersonic Cruise Missiles

Closes 11/6/2026Opened 9/30/2026

U.S. Department Of Homeland Security·Virginia

65% match

Request for Information (RFI) Color Vision Testing

Closes 10/19/2026Opened 10/8/2026

U.S. National Institutes of Health·United States of America

65% match

Limited Competition: Resources and Workforce Development for the Regional Biocontainment Laboratories

Closes 9/29/2027Opened 6/24/2026

U.S. Department Of Defense·California

64% match

TEST

Closes 7/6/2027Opened 7/6/2026

Texas A&M University·Texas

64% match

Testing Natural Gas Meter Systems

Closes 10/14/2026Opened 9/25/2026

U.S. National Energy Technology Laboratory·United States of America

64% match

Advancing Oil and Natural Gas Production and Delivery

Rolling / TBD closeOpened 7/23/2026

U.S. Department Of Defense·Missouri

64% match

QuickSink Notice of Contract Action ( NOCA)

Closes 10/15/2026Opened 9/30/2026

U.S. Department Of Defense·Oklahoma

64% match

WWYK200270 CNSLD Demo Convert Space to Drug Testing Office, B7037

Closes 10/1/2027Opened 7/7/2026

U.S. Department Of Defense·Oklahoma

64% match

RQR

Closes 7/31/2027Opened 8/1/2025

U.S. National Institutes of Health·United States of America

64% match

RNomics Technology Enhancement Centers

Closes 1/31/2027Opened 8/5/2026

U.S. Department Of Defense·District of Columbia

64% match

Thorlabs Infrared Spectrum Analyzer

Closes 10/29/2026Opened 10/24/2025

U.S. Idaho Field Office·United States of America

64% match

RFI - DOE R

Rolling / TBD closeOpened 1/14/2016

U.S. Department Of Defense·United States of America

64% match

59--RADOME

Closes 10/15/2026Opened 10/6/2026

U.S. Department Of Defense·California

64% match

HERMES BAA CALL: Rotating Detonation Rocket Engine-Combined Cycle (RDRE-CC) Flight Demonstration

Closes 11/16/2026Opened 10/1/2026

U.S. Department Of Defense·Florida

64% match

QuickSink Notice of Contract Action ( NOCA)

Closes 10/15/2026Opened 9/30/2026

U.S. National Institutes of Health·United States of America

64% match

RNomics Outreach and Coordination (ROC) Center

Closes 1/31/2027Opened 8/5/2026