The VA Southern Nevada Healthcare System is soliciting a price‑only, fixed‑price construction contract to replace the dental vacuum piping system throughout the VA Las Vegas Medical Center. The contractor must demolish the existing vacuum pumps, trunk lines, separators, and associated supports, then install new vacuum‑pump equipment, PVC, copper, and steel piping, fire‑stop penetrations, and associated electrical and telecom modifications. The work must be completed within 180 calendar days, adhere to strict infection‑control (ICRA) and safety requirements, and comply with the Davis‑Bacon wage determination for Clark County, NV.
• Complete demolition of existing dental vacuum system and removal of all related components.
• Installation of new VacStar VS90 pumps, separator tanks, PVC vacuum lines, copper water lines, steel exhaust, fire‑stop, and associated electrical/telecom upgrades.
• Mandatory coordination with VA infection‑control, utility‑shutdown procedures, and weekly schedule updates; performance bonds, bid guarantee, and liquidated‑damage clause ($1,715/day) apply.