The City of Bridgeport is soliciting sealed paper bids for the construction, renovation, and addition of Phase 2 at John Winthrop Elementary School. The work is divided into bid packages 1.09‑1.15 and includes all site work, structural, mechanical, electrical, and interior finishes required to expand the school facility. Bidders must attend a mandatory pre‑bid walk‑through on October 22, 2026, obtain the full set of plans from DigiPrint (at a cost), and submit two original copies plus one electronic copy by November 17, 2026. The contract will require compliance with Connecticut prevailing‑wage rates, a Project Labor Agreement, insurance, performance bonds, and proof of licensing and SAM/DUNS registration. The award will go to the responsible bidder offering the most advantageous price, considering lead time and other factors.
• Mandatory pre‑bid conference (Oct 22) and paper‑only submission (Nov 17).
• Scope: full school Phase 2 construction – demolition, new classrooms, HVAC, electrical, plumbing, site utilities, and finishes.
• Required certifications: DAS, prevailing‑wage, PLAs, insurance, bonds, state licensing, SAM/DUNS.
• Bids must include a 10 % bid bond (or certified check) for contracts ≥ $100 k; performance bonds required if awarded.
• Plans available for purchase ($30 digital set; additional printing/shipping costs).