The South Dakota Department of the Military is soliciting Statements of Interest from firms interested in providing professional Architecture/Engineering services for the replacement of approximately 30,000 sf of roof area at Fort Meade Building 68. The project scope includes site investigative, design development, and bidding services. The selected A/E shall develop construction plans and specifications detailing the full removal of the existing roofing systems and installation of a new fully adhered EPDM roofing system. The current estimated construction cost for this project is $872K.
• The project requires site investigative, design development, and bidding services.
• The selected A/E shall develop construction plans and specifications for the replacement of the roofing system.
• The project has a current estimated construction cost of $872K.
• The project needs to be designed and ready for bid advertisement no later than January 2026.
• Additional services such as construction administration/inspection will be negotiated later should the project proceed to the construction phase.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Cullen Jorgensen(Engineering Manager)