Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›City of Ashland, Ashland Creek Water Treatment Plant

City of Ashland·Oregon

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026$20M – $40MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Ashland is soliciting competitive bids for the design‑build construction of a new drinking‑water treatment plant at the Ashland Creek site. The scope covers raw‑water conveyance, pressure reduction, chemical pretreatment, filtration, storage, pumping, solar‑array and battery energy‑storage installation, site preparation, demolition of existing structures, utility connections, and full commissioning. Bidders must attend a mandatory pre‑bid conference on 13 Oct 2026 and submit sealed bids by 5 Nov 2026. The contract will be awarded to the lowest responsive and responsible bidder. • New water‑treatment facility with integrated solar‑plus‑storage • Includes civil, mechanical, electrical, and instrumentation work • Required demolition, utility line installation, and site grading • Mandatory pre‑bid meeting (attendance required) • Bid submission deadline: 5 Nov 2026, 1 PM PT • Project location: Ashland, Oregon (city‑owned)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Fleury(Public Works Director)

[email protected]

(541) 488-5587

Key dates

Opened
9/29/2026
Pre-bid meeting
10/13/2026Mandatory
Closes
11/5/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110

Budget estimate

$20,000,000 – $40,000,000

The bid is for a full‑scale drinking‑water treatment plant with solar and battery storage, which typically ranges from $15 M to $45 M for a community of Ashland’s size. Factors influencing the final amount include site conditions, the scale of the solar‑energy system, material prices, and any change‑order scope. Based on comparable municipal water‑treatment projects in the Pacific Northwest, a reasonable estimate is $20 M–$40 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Oregon City of Ashland·Oregon

Top match · 98%

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Town of Ipswich·Massachusetts

86% match

Ipswich Water Treatment Plant

Closes 10/26/2026Opened 8/12/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

83% match

New Sewage Treatment Plant – Skylands Manor (Re‑Bid)

Closes 10/15/2026Opened 9/2/2026

City of Aurora, IL·Illinois

82% match

2027 Water Treatment Plant Chemicals - Calcium Oxide & Fluorosilicic Acid

Closes 10/21/2026Opened 10/6/2026

Oregon Clackamas County·Oregon

82% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/10/2026Opened 10/7/2026

City of Columbus Ohio·Ohio

82% match

Parsons Avenue Water Plant – CW112 Raw Water Line (Invitation for Bid)

Closes 11/4/2026Opened 10/6/2026

City of Columbus·Ohio

82% match

Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

City of Evanston·Illinois

82% match

BID 26-49 Water Treatment Chemicals

Closes 11/3/2026Opened 10/8/2026

City of Aiken·South Carolina

82% match

Water Treatment Chemicals 2027-2028

Closes 12/7/2026Opened 7/17/2026

City of Norfolk·Virginia

82% match

11184-R-2026/MD Water Treatment Chemical

Closes 10/14/2026Opened 10/9/2026

City of Colwich·Kansas

82% match

Colwich Wastewater Treatment Plant Improvements

Closes 10/14/2026Opened 9/22/2026

Oregon City of Monroe·Oregon

81% match

Water System Modernization and Raw Water Intake Improvements

Closes 10/23/2026Opened 9/22/2026

Oregon Parks and Recreation Department·Oregon

81% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

Georgia City of Cartersville·Georgia

81% match

WATER TREATMENT PLANT CHEMICAL FEED AND CONTROL BUILDING UPGRADES

Closes 10/16/2026Opened 9/15/2026

Town of Orange·Virginia

81% match

Town of Orange Water Treatment Plant Chemical Feed Building - PPEA

Closes 12/23/2026Opened 9/25/2026

Town of Waterville, Washington·Washington

81% match

Wastewater Treatment Plant - Habitat Mitigation

Closes 10/28/2026Opened 10/10/2026

City of Ashland·Oregon

81% match

RFP for Use of 2200 Ashland Street Facility

Closes 11/24/2026Opened 10/13/2026

City of Chicago·Illinois

81% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

LA Water & Power·California

81% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 10/14/2026Opened 9/23/2026

City of Marysville, Ohio·Ohio

81% match

2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals

Closes 10/15/2026Opened 9/21/2026

Town of Groton·Connecticut

81% match

IPSWICH WATER TREATMENT PLANT, DWSRF 19229

Closes 10/26/2026Opened 9/1/2026

City of Minot·North Carolina

81% match

BID NOTICE: WATER AND WASTEWATER TREATMENT CHEMICALS

Closes 10/20/2026Opened 9/25/2026

Brazos Valley·Texas

81% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Bi-State Joint Purchasing Council·Illinois

81% match

2027 Water Treatment Chemicals

Closes 10/21/2026Opened 9/23/2026

City of Columbus Ohio·Ohio

81% match

Jackson Pike Water Reclamation Plant – HVAC Unit H46 & H60 Replacement (CDB HVAC Unit H46 & PS1 HVAC Unit H60)

Closes 10/28/2026Opened 9/29/2026