Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Nevada
  4. ›Closed bids
  5. ›Pipeline Installation and Zone Conversion near Warm Springs Road an…

Nevada Government·Nevada

Pipeline Installation and Zone Conversion near Warm Springs Road and Hinson Street

Closes 10/8/2025$1.5M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Las Vegas Valley Water District is seeking bids for the pipeline installation and zone conversion near Warm Springs Road and Hinson Street. The project involves installing pipes along six separate segments within the existing public Right of Way (ROW) and locating residential PRVs either in public ROW or on private property. The work sites are located at existing District water services, and the PRVs will be located immediately adjacent to existing water meters. The engineer's estimate for the project is $1,951,891. • The project requires the installation of pipes along six separate segments. • Residential PRVs will be located either in public ROW or on private property. • The work sites are located at existing District water services. • The PRVs will be located immediately adjacent to existing water meters. • A pre-bid conference will be held online via a scheduled Microsoft TEAMS Meeting. • The bid opening will be held online via a scheduled Microsoft TEAMS Meeting.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chetan Champaneri(Senior Purchasing Analyst)

[email protected]

(702) 258-3849

Key dates

Opened
9/3/2025
Questions due
10/3/2025
Pre-bid meeting
9/15/2025
Closes
10/8/2025

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
010641

Budget estimate

$1,500,000 – $2,500,000

Based on the engineer's estimate of $1,951,891, it is likely that the budget for this project will be in the range of $1.5 million to $2.5 million. This estimate takes into account the scope of the project, which involves the installation of pipes along six separate segments and the location of residential PRVs. The actual budget may vary depending on the complexity of the project, the materials and labor required, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 68%

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Hickman, Nebraska·Nebraska

68% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

City of Fort Wayne·Indiana

68% match

67616 - Tract 11 Lead Service Line and WMR

Closes 10/29/2026Opened 10/9/2026

City of Fort Wayne·Indiana

67% match

83779 - W Jefferson Blvd Storm Outfall

Closes 10/15/2026Opened 9/18/2026

City of Daytona Beach·Florida

67% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 10/29/2026Opened 10/1/2026

City of DeLand·Florida

67% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Fort Wayne·Indiana

67% match

67680 - Tract 10 Lead Service Line and WMR

Closes 10/22/2026Opened 10/2/2026

City of York·Nebraska

67% match

York, NE, York Industrial Subdivision - Infrastructure Improvements, one half mile West of N Division Ave, North of West 25th Street, York, NE - 2026

Closes 10/27/2026Opened 10/7/2026

Texas Corsicana ISD·Texas

66% match

Gas Main Installation - Corsicana Independent School District

Closes 10/19/2026Opened 9/25/2026

Barnwell County·South Carolina

66% match

Improvements to Cemetery Road

Closes 10/30/2026Opened 9/29/2026

Catawba Regional Council of Governments·South Carolina

66% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Rogers Water Utilities·Arkansas

66% match

Blossom Way Sewer Main Pauline Whitaker Dr. to Dixieland Rd

Closes 10/14/2026Opened 9/25/2026

City of Portsmouth·Virginia

66% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Nevada Government·Nevada

66% match

6th Street Water Main Abandonment

Closes 10/27/2026Opened 10/6/2026

Laurens Commission of Public Works·South Carolina

66% match

STEEL MAIN REPLACEMENT PROGRAM - PHASE VI

Closes 10/29/2026Opened 9/28/2026

City of Aurora, OH·Ohio

66% match

Aurora Park Utility Improvements - ReBid

Closes 11/5/2026Opened 10/9/2026

California Department of Transportation·California

66% match

Trenchless culvert installation, cured-in-place pipeliner.

Closes 10/28/2026Opened 9/21/2026

City of Waynesboro·Virginia

66% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Charlotte·North Carolina

66% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Virginia Beach·Virginia

65% match

Service Arena - 242 S Harton Circle Pump Station Force Main Replacement

Closes 10/22/2026Opened 9/10/2026

City Utilities of Springfield·Missouri

65% match

Prequalified Construction: PHMSA 2027-1 Gas & Water Renewals

Closes 10/22/2026Opened 9/23/2026

Georgia City of Cartersville·Georgia

65% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Trumbull County, OH·Ohio

65% match

CALEB ROAD SANITARY SEWER IMPROVEMENTS, PROJECT NO. 4-S-25

Closes 10/30/2026Opened 10/9/2026